BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, asbestos abatement, remodeling and renovation of a clubhouse / community center in Pierce, Colorado. Completed plans call for the remodel of a clubhouse / community center; for the renovation of a clubhouse / community center; for site work for a clubhouse / community center; and for asbestos abatement for a clubhouse / community center.

Reference Number 0000356022 Job Location: 122 W Main Ave., Pierce, CO This project will consist of improvements to the Pierce Senior Center. Work includes remodeling ADA Bathrooms, four window replacements, Painting walls and ceilings and eight electrical fixture replacements, and other miscellaneous work. Project description: This project will consist of improvements to the Pierce Senior Center, 122 W Main Ave., Pierce, CO 80650. The following is a list of the improvements required: Remodel two restrooms, one to make it ADA compliant. Replace four windows with energy-efficient windows. Remove popcorn ceiling in main area and refinish. Paint designated walls and ceilings. Replace eight light fixtures with energy-efficient fixtures. Add alternate bid: Remove Unit heater and install electric baseboard heaters in dining hall. Remove and replace existing flooring in main area and dining hall. On street parking stripping upgrades to meet current ADA design standards. Question Deadline 07/24/2024 at 5:00 PM MT Questions are submitted online No, Questions and Clarifications shall be submitted to Brad Curtis, P.E. piercenorthernengineering.com Project Time: The Work, once started, will be substantially completed within 60 Days consecutive calendar days after the Notice to Proceed and complete and ready for final payment within 15 Days consecutive calendar days past substantial completion. All work will be completed no later than November 1, 2024. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The Town of Pierce reserves the right to reject any or all bids, waive any irregularities or minor defects in bids and to accept the bid if that is in the best interests of the Town.

Award

Clubhouse / Community Centers

$119,837.00

Public - City

Asbestos Abatement, Remodeling, Renovation, Site Work

3

9

2

5

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
40
Bidding Soon
899
All Active Projects
378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.