BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clifton, Arizona. Completed plans call for site work for a water / sewer project.

**As of March 29,2024 this project has not yet been awarded. The project is expected to be awarded sometime in April 2024.** The Project includes the following Work: The Town of Clifton is located within Greenlee County, Arizona. The Town is bisected by the San Francisco River. The area known as South Clifton is protected by a levee designed and completed in 1995 by the Army Corps of Engineers. North Clifton is protected by flood walls on either side of the San Francisco River. To allow drainage from the Town to the San Francisco River there are a series of drains which penetrate the flood walls. To prevent water from back flowing through the drains during high flows in the San Francisco River, the drains are equipped with either slide or flap gates on the downstream, or river side, of the flood walls. This project entails the removal of the existing flap and slide gates and the installation of flap gates, according to the construction plans, specifications, and manufacturer's recommended installation specifications. All project gates are located along the San Francisco River. The Town of Clifton has a budget of $79,000 allotted for this project. The project is expected to be substantially complete in 120 days and ready for final payment in 150 days. Question Deadline 02/28/2024 Questions shall be received in writing up to five (5) business days before the Bid Opening. Address all questions to Chad Crockett, PE, Bowman, ccrockett@bowman.com. Only written questions will be addressed. The Town of Clifton reserves the right to accept the lowest, responsible bid; to consider alternatives; to reject any or all bids; and to waive irregularities or information in any bid. Bids received after the specified time of closing will be returned unopened. The Town of Clifton also reserves the right to hold any or all bids for a period of sixty (60) days after the date of opening. Bidders will not be allowed to withdraw submitted bids during the sixty (60) day period.

Award

Water / Sewer

$78,959.00

Public - City

Site Work

6

13

6

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
31
All Active Projects
16
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

img_map_placeholder

To Be Determined, Clifton, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.