BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Covington, Virginia. Completed plans call for site work for a bridge / tunnel; water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Project Number - 0159-003-699, 0039-008-853, 0707-085-865 Project Number - UPC 118973 (U000-107-171, B605, C501, P101, R201; NHPP-5107(124)) UPC 118974 (0159-003-695, B609, C501, P101, R201; STP-0038(161)) UPC 121159 (0159-003-699, P101, R201; STP-0038(163)) UPC 121160 (0039-008-853, C501, P101, R201; STP-0818(853)) UPC 121162 (0707-085-865, P101, R201; BROS-0858(088)) The Virginia Department of Transportation (VDOT) has a need to accelerate the design and construction of five structurally deficient bridges in the Staunton District. The Staunton District Bridge Bundle includes complete bridge replacements of Route U000 over Jackson River, Route 159 (1037) over Dunlap Creek, and Route 159 (1039) over Dunlap Creek; complete culvert replacement of Route 39 over Guys Run; and superstructure only replacement of Route 707 over North Fork of the Shenandoah River. The proposed project will replace three structurally deficient bridges with new bridges, replace one structurally deficient culvert and one structurally deficient superstructure. In addition, some roadway approach work and drainage construction as needed will be included. The roadwork will be kept to a minimum since these are considered "Bridge" only projects per the Departments guidelines VDOT's current estimated contract value for this Project is approximately $49 million 2 Project Information Meeting 2/22/2024 at 10:00AM EST (prevailing local time) 3 Deadline to submit questions 3/7/2024 at 4:00PM EST (prevailing local time) 4 VDOT will respond to questions 3/19/2024 5 SOQ Submission Date 4/9/2024 at 4:00 PM EDT (prevailing local time) 6 Evaluation and recommendations complete 5/15/2024 7 Notification to Offerors of the short-list 5/22/2024 8 Anticipated RFP Release Date 5/30/2024 9 Letter of Submittals Due 8/13/2024 At 4:00 PM EDT (prevailing local time) 10 Anticipated Award Date 9/18/2024 11 Final Completion 10/25/2029 Questions/clarifications regarding the Request for Qualifications (RFQ) should be submitted to Marshall Eichfeld, P.E. (marshall.eichfeld@vdot.virginia.gov). VADOT - RFQ D/B - Bridge Bundle design-build project

Post-Bid

Bridges / Tunnels

$49,200,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

59

8

5

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
14
Bidding Soon
297
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

August 9, 2024

img_map_placeholder

Multiple Locations, Covington, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.