Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 13, 2024 at 7:00 PM
Updated December 4, 2024
Renovation of a fitness / recreation center in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a 80,000-square-foot fitness / recreation center.
REBID FOR ENTRANCES, STOREFRONTS & CURTAINWALLS (BP 08.40) AND DRYWALL AND FRAMING (BP 09.20) Project Intent is to bring athletics, research, clinical operations as well as entrepreneurial academics together in one building that can build upon each other. A more integrated approach to campus life, with an emphasis on recreation, athletic activity, human performance and applied health science. Renovate existing team, coaches, visitor locker rooms for the teams remaining within the fieldhouse and Wolff Zakin facility to a standard established in the new locker rooms with the Rizza performance center. Scope of Work includes: . Renovation of approximately 80,000 GSF of the existing fieldhouse and portions of the existing Wolff Zackin swimming facility that will meet the University Design Standards and Performance Guidelines. . Renovation includes but is not limited to locker rooms including toilets and showers, strength and conditioning room, exercise, rowing tank room, equipment and receiving, academic center office, tutorial, conference space, open study spaces, classroom, kitchen, ergonomic room, sports medicine, exterior access toilet rooms, MEP support space, National C Club office space and general office and conference rooms. . Renovation will include infrastructure upgrades including but not limited to, HVAC, mechanical, electrical, telcom, IT, AV, security, fire alarm, fire protection, plumbing, site utilities, roof and envelop repairs/upgrade. . Renovation includes abatement of Asbestos Containing Materials (ACM) and may include presumed PCB containing materials. . New Exterior entry vestibule and site/landscape improvements. . The building is targeting LEED V4 certified certification and will conform to Connecticut High Performance Building requirements. . Phase 1 will include work associated with women's swimming withing Wolff Zackin and include team locker rooms, office, and conference rooms witing Wolff Zackin. Phasing and timeline to complete work to be established at the RFP phase. . Phase 2 will be for the remainder of the fieldhouse not included in Phase 1. Question Deadline 11/20/2024 at 5:00 PM ET Please send all RFI's to estimating@doc.build
Post-Bid
Fitness / Rec Centers
$4,000,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2024
March 3, 2025
2111 Hillside Rd, Storrs Mansfield, CT
Related To This Project
Storrs Mansfield, CT
Bid Date: Mar 21 2024
Storrs Mansfield, CT
Bid Date: Mar 27 2024
Storrs Mansfield, CT
Bid Date: Mar 26 2024
Storrs Mansfield, CT
Bid Date: Apr 09 2024
Storrs Mansfield, CT
Bid Date: Apr 11 2024
Storrs Mansfield, CT
Bid Date: Apr 04 2024
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Jun 18 2024
Storrs Mansfield, CT
Bid Date: Feb 27 2024
Storrs Mansfield, CT
Bid Date: Mar 07 2024
Storrs Mansfield, CT
Bid Date: Feb 13 2024
Storrs Mansfield, CT
--
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Jan 11 2024
Storrs Mansfield, CT
Bid Date: Jan 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
