BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Spring Hill, Florida. Completed plans call for site work for a road / highway.

As of June 13, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Construction of Temporary Traffic Signal at County Line Road and Linden Drive. Question Deadline 02/26/2024 at 5:00 PM ET SCOPE OF WORK The Vendor/Contractor will supply all materials, labor, and equipment in order to accomplish the Construction of Temporary Traffic Signal at County Line Road and Linden Drive , as described in the specifications and construction plans showing the proposed improvements in Hernando County, Florida. 10.2. PROJECT DESCRIPTION: A. This project consists of Construction of a temporary traffic signal at the intersection of County Line Road and Linden Dr. B. It will be the Vendor/Contractor's responsibility to provide an acceptable MOT plan at the PreConstruction meeting along with a chart showing the project schedule. C. The Vendor/Contractor shall comply with all applicable OSHA workplace safety requirements and shall accomplish the work in a manner providing for the safety of their equipment and workers and for the safety of the general public. LOCATION OF THE WORK: The work to be performed in this contract will be performed on Intersection of County Line Road and Linden Drive, in Hernando County, Florida. 10.4. GENERAL REQUIREMENTS AND TECHNICAL SPECIFICATIONS Traffic Control/Work Zone Safety A. Prime Contractors must be Florida Department of Transportation (FDOT) prequalified under Work Computerized Traffic Control. B. The Contractor must provide a Certified International Municipal Signal Association (IMSA) Level II Traffic Signal Technician on site at all times during the construction. C. The Contractor must provide a certified FDOT Immediate Temporary Traffic Control (TTC) Technician on site at all times during the construction. D. All roadways shall remain open to through traffic except when a road closure is approved by the County Engineer. E. Contractor shall provide temporary traffic control plans and variable message boards which display the hours of construction. F. The Contractor shall place a minimum of three message boards, two (2) on County Line Road (one eastbound and one westbound) and one (1) on Linden Drive (southbound) at least 10 days before the work commences, as requested by the County Engineer

Award

Roads / Highways

$355,731.00

Public - County

Site Work

15

3

2

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
143
Bidding Soon
2,432
All Active Projects
971
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 15, 2024

May 15, 2024

May 17, 2025

img_map_placeholder

County Line Rd & Linden Dr, Spring Hill, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.