BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Morehead, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of April 12, 2024, the project came in substantially over the budget, so it was not awarded. No plan for rebid. Per Civil Engineer- Bid Date was Extended The City of Morehead in conjunction with the Kentucky Transportation Cabinet is accepting competitive sealed bids for the Triplett Creek Multi Use Project Bidders and DBE subcontractors must be prequalified with the Kentucky Transportation Cabinet and possess a Certificate of Eligibility at time of bid opening. A DBE goal of 4% has been established for this project. All other subcontractors must be prequalified when accepting subcontracts. Prevailing wages apply to this project A 5% Bid Bond is required with the contractors bid. The successful bidder will be required to provide a payment and performance bond in the amount of 100% of the bid. The City reserves the right to reject any and all bids and accept the Lowest Responsive and Responsible Bidder. No BIDDER may withdraw his/her bid within 60 days after the actual date of the opening thereof. Questions about projects during the advertisement should be submitted in writing to the City of Morehead. This may be done by email to Rodney Fouch rfouch@morehead-ky.gov. The City will attempt to answer all submitted questions. The City reserves the right not to answer if the question is not pertinent or does not aid in clarifying the project intent. PROJECT CONTACTS: LPA Project Manager Name: Rodney Fouch Office: 606-784-8505 Agency: City of Morehead Cell Address: 314 Bridge St., Morehead, KY 40351 Email: rfouch@morehead-ky.gov Design Firm Project Manager Name: Stephen Sewell, PE Office: 859-744-1218 Agency: Palmer Engineering Cell: 859-492-0199 Address: 400 Shoppers Dr Winchester KY 40392 Email: ssewell@palmernet.com

Project Abandoned

Roads / Highways

$696,488.00

Public - City

Paving, Site Work

19

11

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
32
Bidding Soon
743
All Active Projects
323
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

October 23, 2024

img_map_placeholder

Triplett St, Morehead, KY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.