Site work for a water / sewer project in Middletown, Pennsylvania. Completed plans call for site work for a water / sewer project.

1) 2024-01: General Construction The project consists of two new aeration tanks, the conversion of the existing oxidation ditches into activated sludge tanks, a new blower & electrical building, a new chemical building, a new final clarifier, a new open channel UV disinfection facility, related site/civil work. The Work generally consists of two new aeration tanks, the conversion of the existing oxidation ditches into activated sludge tanks, new blower & electrical building, new chemical building, new final clarifier, new open channel UV disinfection facility, related site/civil, plumbing and HVAC upgrades, and all associated electrical & instrumentation work. Location- 1800 SWATARA CREEK ROAD MIDDLETOWN, PA 17057 Either a Certified Check or a Bid Bond drawn to the order of the Derry Township Municipal Authority in the amount equal to ten percent (10%) of the amount of the bid must be submitted with the proposal as bid security. The Derry Township Municipal Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse any or all bids submitted, and also reserves the right to waive any informality in bids received, but any contract awarded will be to the lowest responsive, responsible bidder. A. Conversion and expansion of the secondary process including two new aeration tanks and conversion of existing oxidation ditches to activated sludge tanks (all totaling 1.1 million gallons). B. New blower and electrical building and new chemical feed building. C. New final clarifier and associated piping. The existing Sludge Pumping Station will undergo demolition to install new return activated sludge (RAS) and waste activated sludge (WAS) pumps. D. New open channel UV disinfection facility in place of the existing in-pipe UV disinfection. E. Miscellaneous upgrades including a new influent pump, relocation of electrical equipment at the influent pump station, and a new drain valve vault adjacent to the drain pump station. F. Miscellaneous electrical, instrumentation and control, and civil improvements on site. The Work shall be substantially completed within 925 calendar days; final completion- 1,100 calendar days

Award

Water / Sewer

$13,600,000.00

Public - City

Site Work

217

41

14

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
67
Bidding Soon
1,554
All Active Projects
655
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

May 14, 2024

img_map_placeholder

1800 Swatara Creek Rd, Middletown, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.