BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

CSAH 52 Safety Improvements at 10th/11th Location: Csah 52 (E Hennepin Ave) in the City of Minneapolis. Contractor must start construction operations by July 8, 2024, or no later than eight Calendar days after the date of Notice Contract Approval, whichever is later. Contractor must not begin construction operations before contract approval. S-44.2 Contractor must complete all Work to meet the requirements of MnDOT 1516.2, "Project Acceptance," under this Contract before October 11, 2024 If You Have Employed More Than 40 Full-time Employees in Any State, on Any Single Working Day During the Previous 12 Months, You Must Have a Compliance Certificate Issued by the Minnesota Department of Human Rights to Bid on Any Job in This Advertisement. Please Contact the Department of Human Rights Immediately if You Need Assistance in Obtaining a Certificate. The Following Notice From the Minnesota Department of Human Rights Applies to All Contractors: "It is Hereby Agreed Between the Parties That Minnesota Statute, Section 363a.36 and Minnesota Rules, Parts 5000.3400 to 5000.3600 Are Incorporated Into Any Contract Between These Parties Based on This Specification or Any Modification of It. A Copy of Minnesota Statute 363a.36 and Minnesota Rules, Parts 5000.3400 to 5000.3600 is Available Upon Request From the Contracting Agency It is Hereby Agreed Between the Parties That This Agency Will Require Affirmative Action Requirements Be Met by Contractors in Relation to Minnesota Statute 363a.36 And Minnesota Rules 5000.3600. Failure by a Contractor to Implement an Affirmative Action Plan or Make a Good Faith Effort Shall Result in Revocation of Its Certificate or Revocation of the Contract (Minnesota Statute 363a.36, Subd. 2 and 3)." a Minimum Goal of 14.0% Good Faith Effort to Be Subcontracted to Disadvantaged Business Enterprises.

Bid Results

Roads / Highways

$1,582,970.00

Public - County

Paving, Site Work

141

14

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
84
Bidding Soon
797
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

July 8, 2024

img_map_placeholder

E Hennepin Ave, Minneapolis, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.