BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a fire / police facility in Bountiful, Utah. Completed plans call for the renovation of a fire / police facility; for site work for a fire / police facility; and for the construction of a fire / police facility.

Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services. A. The work to be performed generally consists of selective demolition of restroom wall finishes, fixtures and flooring; rebuilding door walls relocating doors to meet ADA clearances; furnishing and installing new flooring, finishes, fixtures and partitions; new lighting, electrical outlets and other miscellaneous work associated with the project. B. The OWNER prefers a construction schedule in which construction impacts the operation of the facility for the shortest time period. Bidders should procure all necessary supplies before commencing construction. Once demolition activities begin, the contractor shall execute the work as efficiently as possible so as to minimize disruption to the operation of the facility. The OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any bid if deemed to be in the best interest of the OWNER. In the event of failure or refusal of the Bidder to enter into the Construction Contract and the delivery to the OWNER a Performance Bond, Payment Bond and any other Bonds or documents required by the Contract Documents after Notice of Intent to Award by the OWNER, the Bidder forfeits the sum of the Bid Bond or cashier's check as liquidated damages to the OWNER. Bid Documents are made available to bidders only for the purpose of obtaining Bids on the Work. No license or grant for any other use is given. The estimated cost of the work of the Work is: $ 225,000.00 Question Submission Close Date 3/1/2024 5:00 PM MST For information about the scope of the project, contact Bill Gould, Gould Plus Architects, (801)-532-2196.

Bid Results

Fire / Police

$183,914.00

Public - City

New Construction, Renovation, Site Work

27

14

6

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
547
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

805 S Main St, Bountiful, UT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.