BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aspen, Colorado. Completed plans call for site work for a water / sewer project.

48 storm pipe along Garmisch from Hallam St to Main St. 24 storm pipe along Hallam from N Aspen St to Garmisch St with associated storm inlets. Replace the existing cast iron (CI) watermain along Garmisch from Hallam to Main St with new 8" ductile iron pipe (DIP) watermain, as well as replacement of all associated water service lines. Refer to Contract Documents for further descriptions of extent of service line replacement. Replace the existing CI watermain along Hallam from N Aspen St to Garmisch St with new 12" DIP watermain, as well as replacement of all associated water service lines. Refer to Contract Documents for further descriptions of extent of service line replacement. Installation of new primary electric conduits to facilitate future Utilities Department capital project replacing existing direct-bury cable with new cable in conduit. Fiber Conduits EV Charger Station Base - Located on Garmisch at the corner with Bleeker. Reference Number 0000343271 The goal of this project is to install the next section of stormpipe in alignment with the Garmisch St Storm Masterplan. The corrugated metal pipe in Garmisch is failing in several sections, including areas along the block between Main St to Hallam St. Several hundred feet of pipe bottom is completely rusted out, and the bedding is exposed and eroding. This project will replace the pipe to restore proper function and reduce safety hazards associated with failing pipe. The project will install storm pipe and associated inlets along Hallam St between Garmisch St and N Aspen St, adjacent to the Red Brick Center for the Arts to alleviate drainage and icing issues as well as align with the City's stormwater master plan. The project will replace three blocks of older cast iron watermains with ductile iron pipe. Replacement sections include Hallam St from Garmisch to N Aspen St, and along Garmisch St from Hallam to Main St. The fourth project goal is to install EV charging station base at the Yellow Brick. Question Deadline 03/09/2024 at 11:59 PM MT Questions must be posted on the ONLINE . Bonding Requirements - Performance Bond 100 % No bid may be withdrawn within a period of sixty (60) calendar days after the date fixed for opening bids.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

16

17

15

4

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
5
Bidding Soon
119
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.