Site work and paving for a civil project in Aspen, Colorado. Working plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

As of April 22, 2024, no bids received for this project. No definite date for the rebid. Reference Number 0000342250 Question Acceptance Deadline 03/20/2024 2:00 PM MT Questions are submitted online Yes, Questions must be posted on the website Answers are posted online for all Offerors to review and consider. It is the Vendor's responsibility to check the website for Q&As, addendums, and other important information. Project start date: May 1, 2024, Project completion date: June 1, 2024 The goal of the project is to repair and replace one of the structural piles on the Castle Creek Bridge underpass retaining wall. The retaining wall has experienced deflection over time. A single pile has been identified for replacement. This work will ensure the safety of the travelling public along the adjacent trail. The retaining wall adjacent to the Castle Creek underpass has experienced deflection in limited locations. This identified location will be set for replacement. The existing retaining wall construction is steel piles with timber log retainment. There are multiple utilities located behind the retaining wall. These utilities include electric, gas, and stormwater. These utilities will need to be protected throughout construction. The Castle Creek Bridge abutment sits behind the retaining wall as well and will also need to be protected. Bonding Requirements - Performance Bond 100 The City reserves the right to reject any or all bids or accept what is, in its judgment, the bid which is in the City's best interest. The City further reserves the right, in the best interests of the City, to accept a late submittal or to waive any technical defects or irregularities in any and all bids submitted. The goal of the project is to repair and replace one of the structural piles on the Castle Creek Bridge underpass retaining wall. The retaining wall has experienced deflection over time. A single pile has been identified for replacement. This work will ensure the safety of the travelling public along the adjacent trail. 2. Scope of Work The retaining wall adjacent to the Castle Creek underpass has experienced deflection in limited locations. This identified location will be set for replacement. The existing retaining wall construction is steel piles with timber log retainment. There are multiple utilities located behind the retaining wall. These utilities include electric, gas, and stormwater. These utilities will need to be protected throughout construction. The Castle Creek Bridge abutment sits behind the retaining wall as well and will also need to be protected. The single failing steel pile will need to be replaced. The specified method is grout injection for stabilization and reconstruction. Refer to Exhibit H - Castle Creek Underpass Construction Drawings for additional information. Right-of-Way ROW Permitting will taken care of by City of Aspen Project Manager. Item Qty Unit Unit Price Item Price Mobilization 1 LS $ $ Removal of Asphalt Mat 1 SY $ $ Removal of Pavement 1 SY $ $ Remove Wall 16 LF $ $ Structure Excavation (Special) 1 CY $ $ Grout Modified Soil 16 CY $ $ Concrete Washout Structure 1 EA $ $ Erosion Log Type 1 (20 Inch) 63 LF $ $ Prefabricated Concrete Washout Structure (Type 1) 1 EA $ $ Modify Existing Structure 1 LS $ $ Asphalt (Patching) 1 SY $ $ Concrete Pavement (Patching) 1 SY $ $ Provide Temporary Support 1 EA $ $ Construction Surveying 1 LS $ $ Barricade (Type 3 M-A) (Temp) 2 EA $ $ Construction Traffic Sign (Panel Size A) 3 EA $ $ Section Subtotal $

Final Planning

Bridges / Tunnels

$850,000.00

Public - City

Paving, Site Work

55

14

2

6

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
5
Bidding Soon
119
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

October 22, 2024

img_map_placeholder

Multiple Locations, Aspen, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.