BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fox Point, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

The work associated with 2024 Lake Drive Storm Drainage Improvements Project includes the Clearing and Grubbing - 200 ID . Removing Asphaltic Surface - 1,400 SY Base Aggregate Dense 1 1/4- lnch (Driveways) - 420 TON . HMA Pavement (Road and Driveways) - 350 TON Concrete Pavement (Driveways) - 110 SY . Culvert Pipe Class III-B 18-lnch and 24-lnch - 80 LF . Culvert Pipe Reinforced Concrete Class V 21-lnch - 120 LF . Culvert Pipe Reinforced Concrete Horizontal Elliptical HE-IV 24x38-lnch - 60 LF. Storm Manholes 4-FT, 5-FT and 6-FT Diameter - 10 EACH . HDPE Storm Sewer 8-lnch, 10-lnch, 12-lnch, 15-lnch, 18-lnch and 24-lnch - 3,110 LF . Nyloplast Drain Basin 24-lnch and 36-lnch (With Frame and Grates) - 28 EACH . Ditch Regrading - 3,850 LF . Landscaping Restoration AllInclusive - 6,700 SY . Erosion Bales 50 EACH and Inlet Protection - 31 EACH . Traffic Control - 1 LS The anticipated project start date is April 15, 2024. The selected Contractor must complete all work Not Later Than of November 15, 2024. BID GUARANTEE: Only those bids that are accompanied by a Bid Bond or unqualified certified check in an amount not less than five percent (5%) of the bid will be considered. The Bid Bond or certified check serves as a guarantee that if the bid is accepted, the bidder will execute and file the Agreement arid CI 100% Performance Bond and Payment Bond within fifteen (15) days after the Notice of Award. In case the bidder fails to file such contract and bond within the time set forth, the certified check or Bid Bond shall be forfeited as liquidated damages The Village of Fox Point reserves the right to reject any or all bids, to accept any bid most advantageous to it, or waive any technicality. BID WITHDRAWAL: No bid shall be withdrawn for a period of ninety (90) days after the bid opening date without the consent of the Village of Fox Point. award date is March 12, 2024 Pre-Qualification: Yes

Award

Sidewalks / Parking Lot

$764,763.00

Public - City

Paving, Site Work

29

14

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
60
Bidding Soon
925
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

N Lake Dr, Fox Point, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.