Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2024 at 8:00 PM
Updated May 9, 2024
Site work and paving for a mixed-use development in Fox Point, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.
The work associated with 2024 Lake Drive Storm Drainage Improvements Project includes the Clearing and Grubbing - 200 ID . Removing Asphaltic Surface - 1,400 SY Base Aggregate Dense 1 1/4- lnch (Driveways) - 420 TON . HMA Pavement (Road and Driveways) - 350 TON Concrete Pavement (Driveways) - 110 SY . Culvert Pipe Class III-B 18-lnch and 24-lnch - 80 LF . Culvert Pipe Reinforced Concrete Class V 21-lnch - 120 LF . Culvert Pipe Reinforced Concrete Horizontal Elliptical HE-IV 24x38-lnch - 60 LF. Storm Manholes 4-FT, 5-FT and 6-FT Diameter - 10 EACH . HDPE Storm Sewer 8-lnch, 10-lnch, 12-lnch, 15-lnch, 18-lnch and 24-lnch - 3,110 LF . Nyloplast Drain Basin 24-lnch and 36-lnch (With Frame and Grates) - 28 EACH . Ditch Regrading - 3,850 LF . Landscaping Restoration AllInclusive - 6,700 SY . Erosion Bales 50 EACH and Inlet Protection - 31 EACH . Traffic Control - 1 LS The anticipated project start date is April 15, 2024. The selected Contractor must complete all work Not Later Than of November 15, 2024. BID GUARANTEE: Only those bids that are accompanied by a Bid Bond or unqualified certified check in an amount not less than five percent (5%) of the bid will be considered. The Bid Bond or certified check serves as a guarantee that if the bid is accepted, the bidder will execute and file the Agreement arid CI 100% Performance Bond and Payment Bond within fifteen (15) days after the Notice of Award. In case the bidder fails to file such contract and bond within the time set forth, the certified check or Bid Bond shall be forfeited as liquidated damages The Village of Fox Point reserves the right to reject any or all bids, to accept any bid most advantageous to it, or waive any technicality. BID WITHDRAWAL: No bid shall be withdrawn for a period of ninety (90) days after the bid opening date without the consent of the Village of Fox Point. award date is March 12, 2024 Pre-Qualification: Yes
Award
Sidewalks / Parking Lot
$764,763.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2024
April 4, 2024
N Lake Dr, Fox Point, WI
Related To This Project
Fox Point, WI
--
Fox Point, WI
Bid Date: Mar 26 2024
Fox Point, WI
--
Fox Point, WI
Bid Date: Jan 14 2025
Fox Point, WI
--
Fox Point, WI
Bid Date: Mar 27 2025
Fox Point, WI
Bid Date: Mar 20 2025
Fox Point, WI
Bid Date: Dec 16 2025
Fox Point, WI
Bid Date: Feb 22 2024
Fox Point, WI
Bid Date: Jan 25 2024
Fox Point, WI
Bid Date: Jan 25 2024
Fox Point, WI
Bid Date: Jan 18 2024
Fox Point, WI
Bid Date: Nov 15 2023
Fox Point, WI
Bid Date: Nov 17 2023
Fox Point, WI
Bid Date: Jul 06 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
