BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2024 at 8:00 PM

Updated March 12, 2024

Site work and paving for a mixed-use development in Cedar Falls, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project involves the restoration of portions of six (6) city streets totaling 1.54 miles. Work will include 11,345 sy of pavement removal by milling, 5322 tons of asphalt placement, 7,038 lf of pavement saw cutting, replacement of pedestrian ramps, modifications to existing storm sewer intakes, manhole adjustments, and pavement striping. Site Directions: Locations include Linden Avenue, Laurel Circle, Nordic Drive, Grand Boulevard, Lone Tree Road, and Greenhill Road. Contact Ben Claypool for document distribution or any questions via phone: (319) 243-2704, or email: Benjamin.claypool@cedarfalls.com. Est. Value - $ 1,563,165.25 Locations include Linden Avenue, Laurel Circle, Nordic Drive, Grand Boulevard, Lone Tree Road, and Greenhill Road. The work under the proposed contract shall commence within ten (10) calendar days after the date set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. Contractor shall reach substantial completion no later than October 1, 2024, and shall fully complete close-out of the project no later than November 1, 2024. In addition, certain streets shall be completed within the calendar days specified in the plans. Calendar days allotted for specific staging within certain streets shall apply only to each individual stage and any remaining calendar days on a given stage cannot be used on another stage. Each Form of Proposal shall be accompanied by a bid security as defined in the Instructions to Bidders- Division 1 Section 05. The successful Bidder shall furnish to the City a performance bond in an amount equal to one hundred percent (100%) of the contract price, guaranteeing faithful performance of the contract and guaranteeing the completed project against defective workmanship and materials for a period of two (2) years from and after completion and acceptance by the City. The successful Bidder shall also provide a payment bond in an amount equal to one hundred percent (100%) of the contract price guaranteeing payment of all persons supplying labor and materials, or both, in the execution of the work provided for in the contract The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids.

Bid Results

Roads / Highways

$1,023,036.00

Public - City

Paving, Site Work

26

9

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
120
Bidding Soon
1,436
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2024

May 7, 2024

Project location map

Multiple Locations, Cedar Falls, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.