BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a detention facility in Folsom, California. Completed plans call for the renovation of a detention facility.

Bid per plans and specifications. A detailed materials list FOR EACH ROOF, including quantities, unit pricing and brand/model information, must be provided with bid. Note: All Lot deliveries must be coordinated with project CSII's prior to delivery or will not be accepted Lots FOR EACH ROOF to include, but are not limited to the following, as applicable: Roofing membrane, membrane flashings, detail Membrane, roofing insulation, tapered insulation, foil face tapes, termination tapes, fasteners, anchors, termination bars, protection walk pads, pipe flashings, pre-primed barrier boards, stainless steel pipe clamps, pre-formed crickets and can't, scuppers and retro-fit roof drain insert extensions. All extruded polystyrene (XPS) insulation, XPS tapered insulation, vapor barrier retarder, gypsum sheathing and protection roof boards (primed and un-primed, all membrane for roof, wall, base, scuppers, roof vents, flashings, mechanical curbs and walk pads. C-YARD BUILDING C5/C6 - ROOF ASSEMBLY - complete roofing system. Thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil., with factory applied felt backing, in 6' X 80' or 10' x 80' rolls, white exposed face color, to cover approximately 32,000 square feet of roof. Bid must include all materials to be installed over a concrete deck. Lot is not to be delivered until requested by IWL Construction Supervisor. SHEET METAL PRODUCTS FOR ROOF - To include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list.) ADHESIVES AND SEALANTS FOR ROOF AND WALLS - To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1 29 & 1-49) WARRANTY - Manufacturer's, Standard Twenty (20) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07.54.19-7.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. TECHNICAL ASSISTANCE - on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. SUBMITTALS - per attached specifications section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. ROOFING MATERIALS, TEN PERCENT (10%) - ten percent (10%) of the following roofing materials include separate shipping fee, to be delivered only upon request of Construction Supervisor: All extruded polystyrene (XPS) insulation, XPS tapered insulation, vapor barrier retarder, gypsum sheathing and protection roof boards (primed and un-primed, all membrane for roof, wall, base, roof vents, flashings, mechanical curbs, sealants, caulks, fasteners, anchors and walk pads. (Quantity, unit price and product information of all items must be included on materials list.) C-YARD BUILDING C7/C8 - ROOF ASSEMBLY - complete roofing system. Thermoplastic roofing membrane, adhered polyvinyl chloride (PVC), 80 mil., with factory applied felt backing, in 6' X 80' or 10' x 80' rolls, white exposed face color, to cover approximately 32,000 square feet of roof. Bid must include all materials to be installed over a concrete deck. Lot is not to be delivered until requested by IWL Construction Supervisor. SHEET METAL PRODUCTS FOR ROOF - To include but not limited to: Cladded sheet metal provided in 4' X 10' sheets, in quantities as required per plans and specifications. Fabrication of sheet metal to be completed by Inmate Ward Labor (IWL), unless otherwise stated in this IFB. (Quantity, unit price and product information of sheet metal products must be included on materials list.) ADHESIVES AND SEALANTS FOR ROOF AND WALLS - To be delivered upon request by IWL Construction Supervisor. (Quantity, unit price and product information of Adhesives and Sealants must be included on materials list.) The coverage rate for membrane adhesive shall be 100SF per gallon. The coverage for insulation adhesive must meet FM Global Property Loss Prevention Data Sheets (1-29 & 1-49) WARRANTY - Manufacturer's, Standard Twenty (20) Year, Full System, No Dollar Limit Warranty, (labor/material warranty), warranty shall be non-prorated. (This language supersedes specification section 07.54.19-7.) NOTE: Warranty will not be paid until the roof is installed and is accepted by the manufacturer's representative. TECHNICAL ASSISTANCE - on-site inspection, testing, training and certification of IWL staff by roofing manufacturer's representative. SUBMITTALS - per attached specifications section 01 33 23 and the attached CDCR Roof System Review Checklist (refer to Attachment XI). Complete roof system must have FM Global listing, including wind uplift. Product data sheets, shop drawings, manufacturer's certification, manufacturer's installation instructions, and warranty (sample), as well as all layouts listed on the CDCR Roof System Review Checklist must be included in submittal package. Additional Site Walkthrough Note: Gate Clearance information may be submitted to: California Department of Corrections and Rehabilitation Folsom State Prison Attn: Adam Kenoyer, CSII Peter Gonzales CSII Phone: (916) 358-2775, (916) 985-2561 E-mail: adam.kenoyer @cdcr.ca.gov, peter.gonzales@cdcr.ca.gov CC: paul.troutt@cdcr.ca.gov Written questions must be received by 5:00 PM, close of business on March 22, 2024.

Post-Bid

Jails / Prisons

$1,787,000.00

Public - State/Provincial

Renovation

72

28

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
78
Bidding Soon
1,404
All Active Projects
587
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.