Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Greenville, South Carolina. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.
This project generally consists of Safety Area Improvements for Runway 1 at Greenville Downtown Airport. The project Base Bid involves all demolition, grading, drainage, paving, retaining wall and installation of Owner-supplied Engineered Materials Arresting System (EMAS) for Runway 1 threshold. The EMAS materials will be supplied by the Airport for installation by the Contractor. Work includes approximately 45,000 cubic yards of earthwork, construction of permanent dry detention basin, 405 linear feet of variable height mechanically stabilized earth (MSE) retaining wall, storm drainage pipe and structures, construction of 4,365 square yards of asphalt pavement (including base). Incidental items include grassing, pavement markings, and runway threshold and approach lighting modifications. In addition, the project required sediment and erosion control measures, and other incidental items. Questions of a technical nature should be directed electronically via email to kmorris@holtconsultingco,com Base Bid involves demo, grading, drainage, paving, retaining wall & install of supplied EMAS for RWY. Includes approx 45K cu yds of dirt, construction of perm dry detention basin, 405 lf of variable ht mechanically stabilized earth (MSE) retaining wall, drainage pipe & structures, construction of 4,365 sq yds of asphalt pvmt (including base). Incidental items include grassing, pvmt marking, lighting modifications, sediment/erosion control measures & other items. Project Location : Greenville Downtown Airport, 100 Tower Drive, Unit 2, Greenville, SC 29607 Construction Cost Range: $2.5M to $5M Bid security in the form of a bid bond, made payable to the Greenville Airport Commission, Greenville, South Carolina, equal to 5% of the total bid is required. Contract security in the form of 100% Performance and Payment Bonds will be required. The Project (Base Bid) is to be completed within a maximum of 330 consecutive calendar days from the commencement date specified in the written Notice to Proceed. Substantial Completion for all work shall be achieved within a maximum of 300 consecutive calendar days from the commencement data specified in the written Notice to Proceed. The project will be constructed in multiple phases, some of which will require night work within the runway safety area. The contract time also includes a 60-day wait period for embankment settlement which coincides with typical winter shutdown months. For all actions involving procurement of supplies, services, or construction for the Greenville Airport Commission and Greenville Downtown Airport, the provisions of Chapter 13 of Title 8 (State Ethics Act) of the South Carolina Code of Laws, 1976, [8-13-100 - 8-13-1520], as it may be amended from time to time, shall be complied with The Greenville Airport Commission (the Owner) reserves the right to waive any informalities or irregularities in the bids received, to negotiate certain or all contract bid items, to reject any or all bids and to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests. Bid date info :All submissions must be received in a sealed envelope and addressed to James Stephens, Airport Director, Greenville Downtown Airport, and labeled with the Project Name, FAA AIP Project Number, and the Submitter's name and address. Questions of a technical nature should be directed electronically via email to kmorris@holtconsultingco.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$5,246,355.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
May 29, 2024
100 Tower Dr, Greenville, SC
Related To This Project
Greenville, SC
Bid Date: Apr 04 2024
Greenville, SC
Bid Date: Feb 28 2024
Greenville, SC
Bid Date: Feb 18 2021
Greenville, SC
Bid Date: Mar 13 2024
Greenville, SC
--
Greenville, SC
Bid Date: Mar 20 2024
Greenville, SC
Bid Date: May 30 2024
Greenville, SC
--
Greenville, SC
Bid Date: Mar 21 2024
Greenville, SC
Bid Date: Mar 19 2024
Greenville, SC
Bid Date: Mar 15 2024
Greenville, SC
--
Greenville, SC
--
Greenville, SC
Bid Date: Feb 21 2024
Greenville, SC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.