BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in Greenville, South Carolina. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

This project generally consists of Safety Area Improvements for Runway 1 at Greenville Downtown Airport. The project Base Bid involves all demolition, grading, drainage, paving, retaining wall and installation of Owner-supplied Engineered Materials Arresting System (EMAS) for Runway 1 threshold. The EMAS materials will be supplied by the Airport for installation by the Contractor. Work includes approximately 45,000 cubic yards of earthwork, construction of permanent dry detention basin, 405 linear feet of variable height mechanically stabilized earth (MSE) retaining wall, storm drainage pipe and structures, construction of 4,365 square yards of asphalt pavement (including base). Incidental items include grassing, pavement markings, and runway threshold and approach lighting modifications. In addition, the project required sediment and erosion control measures, and other incidental items. Questions of a technical nature should be directed electronically via email to kmorris@holtconsultingco,com Base Bid involves demo, grading, drainage, paving, retaining wall & install of supplied EMAS for RWY. Includes approx 45K cu yds of dirt, construction of perm dry detention basin, 405 lf of variable ht mechanically stabilized earth (MSE) retaining wall, drainage pipe & structures, construction of 4,365 sq yds of asphalt pvmt (including base). Incidental items include grassing, pvmt marking, lighting modifications, sediment/erosion control measures & other items. Project Location : Greenville Downtown Airport, 100 Tower Drive, Unit 2, Greenville, SC 29607 Construction Cost Range: $2.5M to $5M Bid security in the form of a bid bond, made payable to the Greenville Airport Commission, Greenville, South Carolina, equal to 5% of the total bid is required. Contract security in the form of 100% Performance and Payment Bonds will be required. The Project (Base Bid) is to be completed within a maximum of 330 consecutive calendar days from the commencement date specified in the written Notice to Proceed. Substantial Completion for all work shall be achieved within a maximum of 300 consecutive calendar days from the commencement data specified in the written Notice to Proceed. The project will be constructed in multiple phases, some of which will require night work within the runway safety area. The contract time also includes a 60-day wait period for embankment settlement which coincides with typical winter shutdown months. For all actions involving procurement of supplies, services, or construction for the Greenville Airport Commission and Greenville Downtown Airport, the provisions of Chapter 13 of Title 8 (State Ethics Act) of the South Carolina Code of Laws, 1976, [8-13-100 - 8-13-1520], as it may be amended from time to time, shall be complied with The Greenville Airport Commission (the Owner) reserves the right to waive any informalities or irregularities in the bids received, to negotiate certain or all contract bid items, to reject any or all bids and to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests. Bid date info :All submissions must be received in a sealed envelope and addressed to James Stephens, Airport Director, Greenville Downtown Airport, and labeled with the Project Name, FAA AIP Project Number, and the Submitter's name and address. Questions of a technical nature should be directed electronically via email to kmorris@holtconsultingco.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$5,246,355.00

Public - City

Outdoor Lighting, Paving, Site Work

87

13

60

9

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
730
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

May 29, 2024

img_map_placeholder

100 Tower Dr, Greenville, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.