BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Union, Missouri. Completed plans call for site work for a water / sewer project.

This scope of work includes all materials, equipment, transportation and labor needed to install approximately 8,500 linear feet of continuous sewer lining at various locations in the City of Union, MO. Project items include pipe lining, service reinstatement,traffic control and other minor activities related to the proper installation of the liner. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications. Any questions or clarifications concerning this Advertisement for Bid must be submitted via email to: J.D. Kelley, City Engineer, engineer@unionmissouri.gov. The Contractor and all subcontractors will be required to comply with all applicable State Regulations including Equal Employment Opportunities, Non-segregated Facilities, Prevailing Wage Rates and Affirmative Action Requirements, and all other work incidental thereto as described in the Contract Documents. Any person signing a contract to work on the construction of public works for any public body shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees which includes a course in construction safety and health approved by OSHA or a similar program approved by the department which is at least as stringent as an approved OSHA program. All employees are required to complete the program within sixty days of beginning work on such construction project. The Owner reserves the right to waive any informalities or irregularities and to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the information for bidders. No bidder may withdraw his bid within thirty (30) days after the actual date of the opening thereof.

Award

Water / Sewer

$263,807.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
51
Bidding Soon
885
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Union, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.