BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Maryville, Tennessee. Completed plans call for site work for a water / sewer project.

The successful bidder will repair approximately 100 feet of the left bank of Pistol Creek and approximately 275 feet of both banks of Battle Creek flowing through Bicentennial Park in Maryville, TN, as more fully described in the plan documents. Soil and vegetative bioengineering techniques will be used to stabilize existing streambanks including streambank grading, installation of coir fiber matting and stone at the toe of the bank, and native vegetation planting including 50 ball and burlap trees and 67 bare root seedlings. This project also involves the relocation of a section of greenway trail. The bids will consist of a Base Bid, and a Bid Alternative 1. The City of Maryville will choose which bid to proceed with based on available budget. Responsive bidders must have familiarity with streambank stabilization construction techniques and provide a brief list of similar projects successfully completed within the past five years, with references. Bid packages that do not include this information will be rejected. The project herein described as the base bid is to be completed within sixty (60) calendar days after the date when the Contract Time commences to run. Please see the Technical Special Provisions for further scheduling requirements. Liquidated damages for delay of completion of contract will be in accordance with the Agreement (Contract). All bidders must be able to demonstrate before the award of the contract that the proposer (and subcontractors if applicable) has all appropriate licenses and certifications required in the State of Tennessee to perform the Services. This project is funded by the City of Maryville. The Contractor shall comply with all State, Federal, and Local laws and/or regulations. The OWNER reserves the right to waive any irregularities or reject any or all bids. The City of Maryville does not discriminate based on race, color, or national origin in federal or state approved programs, pursuant to Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d). *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. All questions about the meaning or intent or the Contract Documents shall be submitted to the Engineer in writing

Award

Water / Sewer

$122,650.00

Public - City

Site Work

16

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
22
Bidding Soon
525
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

McCammon Ave, Maryville, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.