BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for an educational facility in Brookline, Massachusetts. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

The work described in these Bid Documents is for bulk demolition, selective demolition, MEPcut, cap, and make safe, temporary utilities, hazardous materials abatement, and site enabling for theentireNew John R. Pierce School Project. The scope described is scheduled to start in early July 2024. Theexisting John R. Pierce School is comprised of 2 buildings, built around 1970 and a historic buildingconsisting built around 1904. The 1970s building will be demolished in its entirety down to thebottom of the lowest existing footing. There is some selective demolition included in the existingparking garage of the 1970a building. The historic building will include selective demolitionas described in these documents. All existing utilities with be cut, capped, and made safe for bothbuildings prior to start of demolition. All hazardous materials as described in the attached report shall be demolished. Construction MBE 4.2%, WBE 8.8% The project is located at 50 School Street in Brookline, MA 02445 and consists of the construction of an approximately 157,613 square feet K-8 school, 73,816 square feet is an underground parking garage and development of the 2.5-acre site. The construction consists initially of abatement/demolition of the existing school, followed immediately by new construction and associated site improvements. The abatement/demolition of the old school must be complete by February 19, 2025 and new construction and site improvements must be substantially complete by October 29, 2027. The Project Team includes the Design Firms of Miller Dyer Spears (MDS) of Boston, MA with associate architect Sasaki of Watertown, MA and the Owner's Project Management firm of LeftField, LLC of Boston, MA and the Construction Management Team of Consigli Construction of Milford, MA John R. Pierce School, 50 School St., Brookline, MA. Bid Package No. 1 - Early Demolition and Site Enabling Package work only is being bid.

Bid Results

Educational

$309,495.00

Public - City

Demolition, Site Work

45

18

9

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
232
Bidding Soon
2,777
All Active Projects
1,265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

July 2, 2024

img_map_placeholder

50 School St, Brookline, MA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.