BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Coulee Dam, Washington. Completed plans call for the renovation of a educational facility.

**As of March 13, 2024, the project was awarded to The low bidder, Lakes General LLC but the awarded amount is not available.** CTE Building Restroom and Door ADA Project For upgrade of three existing restrooms serving the Lake Roosevelt gymnasium and preschool wing for greater capacity and barrier free accessibility, and for the replacement of up to ten exterior doors. The Board of Directors of Grand Coulee Dam School District reserves the right to reject any or all bids and to waive irregularities as informality. Grand Coulee Dam School District is committed to providing the maximum practicable opportunity for participation by Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Veteran Owned Businesses; however, no minimum level of participation shall be required as a condition of selection. Architect's Project Valuation a. $340,000 - $420,000 plus tax o Demolition Gym hall restrooms and staff room may be taken out of commission immediately and demolished per demolition sheets. Demolition of the staff room from the gym hall is recommended for safety of preschool staff and students using the preschool hall restrooms. Preschool Wing Restroom and Hall Demolition shall be deferred until preschool in the building has concluded for the year. Safety precautions and critical barriers shall be made for preschool staff and students using the preschool hallway leading to the staff room. o Reconstruction Existing Men's and Women's restrooms combine to become new Men's ADA compliant restroom with greater capacity. Existing Staff Room floor is removed to build a new ADA compliant Women's Restroom with greater capacity at gym hall elevation through door cut into gym hall CMU block wall. Preschool East Restroom is combined with obsolete hall to former Staff Room to facilitate a nongendered ADA compliant restroom with changing table. Preschool West Restroom finishes are updated to facilitate a non-gendered non-ADA restroom. Any questions bidders may have, with regard to the Plans and Specifications, may be submitted to the Project Manager by phone or email for consideration prior to the bid submission cut-off date and time.

Award

Educational

$292,000.00

Public - City

Renovation

22

19

3

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
4
Bidding Soon
118
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

March 15, 2024

img_map_placeholder

110 Stevens Ave, Coulee Dam, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.