Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Ontario, Oregon. Completed plans call for the renovation of a detention facility.
This project is complete removal and replacement of the existing Cooling Towers and exterior piping systems including all aspects of the project. The existing concrete support structure shall be used for the new cooling towers with modifications by installing new steel supports on top of concrete. The scope of work for this project is complete removal and replacement of the existing Cooling Towers and exterior piping systems including all aspects of the project. The existing concrete support structure shall be used for the new cooling towers with modifications by installing new steel supports on top of concrete. The condenser water chemical treatment systems shall remain without modification, however this project does include the addition of a spare chemical treatment controller and three chemical feed metering pumps to be provided as spares. Allow Electronic Quote: Yes Informal Bid Flag: No The following range is a project estimate for bonding purposes: $1,400,000-$1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: Two Hundred Seventy (270) Calendar Days from NOTICE TO PROCEED Final Completion: Three Hundred (300) Calendar Days from NOTICE TO PROCEED Liquidated damages of $450.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $450.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 4 of the Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $450.00 per calendar day elapsed in excess of the Final Completion date stated in Section 4 of the Agreement. The single point of contact for questions regarding the ITB, forms, Specifications, Plans, bidding process, change, clarification, the award process, protests, brand approval, or substitution requests and/or any other issues that may arise, is: Ryan N. Kirtley (971) 707-0238 Ryan.N.Kirtley@doc.oregon.gov. OBTAINING ITB DOCUMENTS: This ITB, ITB attachments and any Addenda and notices (Amendments) may be downloaded from the OregonBuys eProcurement system at: https://oregonbuys.gov/bso . Contact the Purchaser identified in OregonBuys for this ITB if unable to access solicitation documents via OregonBuys. Final Completion: Three Hundred (300) Calendar Days from NOTICE TO PROCEED Question Deadline 03/21/2024 at 2:00 PM MT
Award
Jails / Prisons
$1,011,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2024
May 27, 2024
777 Stanton Blvd, Ontario, OR
Related To This Project
Ontario, OR
Bid Date: Apr 04 2024
Ontario, OR
Bid Date: Apr 15 2024
Ontario, OR
Bid Date: Apr 18 2024
Ontario, OR
Bid Date: Apr 18 2024
Ontario, OR
Bid Date: May 31 2024
Ontario, OR
Bid Date: Jun 20 2024
Ontario, OR
Bid Date: Jul 15 2024
Ontario, OR
Bid Date: Jul 23 2024
Ontario, OR
Bid Date: Feb 27 2024
Ontario, OR
Bid Date: Feb 08 2024
Ontario, OR
Bid Date: Jan 24 2024
Ontario, OR
Bid Date: Feb 06 2024
Ontario, OR
Bid Date: Nov 24 2023
Ontario, OR
Bid Date: Mar 23 2022
Ontario, OR
Bid Date: Feb 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.