BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Big Spring, Texas. Conceptual plans call for site work for a transportation facility.

The City of Big Spring, TX intends to engage a professional engineering firm for services pursuant to Chapter 2254, Subchapter A, of the Government Code, for the City of Big Spring's Airpark Department. The City of Big Spring will solicit and receive qualification statements for the current aviation project as described below. Scope: Provide engineering and design services, including construction administration, to: 1. Stripe and Mark the Airport consistent with the requirements of FAA AC 150/5340-1M - Standards for Airport Markings. The project will include striping and marking Runway 17/35, Runway 06/24, Taxiway A (Alpha), Taxiway B (Bravo), Taxiway C (Charlie), Taxiway D (Delta), Taxiway E (Echo), and Taxiway F (Foxtrot). A site visit should be required to determine linear feet and any special markings. Attached is an exhibit that shows the surfaces. 2. Providers will help the City fulfill State and Federal statutory responsibilities related to the specific grant or funding sources. 3. Providers will assist the City in completion of Program Engineering services for one or more programs or services (environmental, acquisition, general administration, etc.) 4. Program engineering services must be performed in compliance with the guidance provided by the grant or funding sources (US Treasury, FAA, State of Texas, TxDOT Aviation and/or Local Government Code, City of Big Spring, etc.). The City of Big Spring, TX reserves the right to determine which of the services listed above may or may not be awarded to the successful firm and to initiate additional procurement action for any of the services listed above. The City of Big Spring, TX, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all respondents that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Future contracts are subject to 49 CFR Part 26 concerning the participation of Disadvantaged Business Enterprises (DBE). The DBE goal for the design phase of the current project is 0%. The goal will be re-set for the construction phase. Utilizing multiple engineering/design and construction grants over the course of the next five years, future scope of work items at the City of Big Spring may include the following: design and construction for Runway 06/24 Rehabilitation; Design and Construction of Airfield Lighting Upgrades. The City of Big Spring reserves the right to determine which of the services listed above may or may not be awarded to the successful firm and to initiate additional procurement action for any of the services listed above. To assist in your qualification statement preparation the criteria, project diagram, and most recent Airport Layout Plan are available electronically from the Airport Director at mfeeley@mybigsprng.com. The qualification statement should address a technical approach for the current scope only. Firms shall use page 4, Recent Airport Experience, to list relevant past projects. The completed Form AVN-550 must be received in a sealed envelope and labeled Qualifications (RFQ) for Engineering/Architectural/Surveying Services for the City of Big Spring, TX , followed by the firm's legal name. The Form AVN-550 must be enclosed and sealed inside another envelope addressed for mailing. The consultant selection committee will be composed of the Airport Manager and two (2) other local government representatives. The final selection by the committee will generally be made following the completion of review of AVN-550s. The committee will review all AVN-550s and rate and rank each Please contact the Airport Director for any technical or procedural questions at (432) 264-2362.

Conceptual

Transportation Terminals

$550,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
28
Bidding Soon
508
All Active Projects
211
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 5, 2025

img_map_placeholder

To Be Determined, Big Spring, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.