BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hiawatha, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Site Directions: 1st Ave from Blairs Ferry Rd to Willman Ave and 11th Ave from Emmons St to Rainbow Blvd The 2024 Street Improvements project involves Crack & Seat, HMA overlay, curb and gutter replacement, sidewalk replacement and ADA ramp replacements on 1st Ave from Blairs Ferry Rd to Willman St and 11th Ave from Emmons St to Rainbow Blvd. There is minimal site restoration where sidewalks and curb and gutters are removed and replaced. Est. Value - $ 370,000.00 Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. Description: All work associated with 1st Ave from Blairs Ferry Rd to Willman St. Early Start: April 8, 2024 Substantial Completion: August 9, 2024 Final Completion: August 23, 2024 Contractor shall minimize full road closure to five (5) working days. Once work begins on this site, the contractor shall complete all work within twenty-one (21) calendar days. Liquidated damages in the amount of Five Hundred ($500.00) dollars per calendar day will be assessed for any work exceeding 21 calendar days minus any required watering of the sod. Liquidated damages in the amount of One Thousand ($1,000.00) dollars per calendar day will be assessed for any work not completed by the Final Completion outlined above minus any required watering of the sod. Description: All work associated with 11th Ave from Rainbow Blvd to Emmons St. Early Start: April 8, 2024 Substantial Completion: August 9, 2024 Final Completion: August 23, 2024 Contractor shall minimize full road closure to five (5) working days. Once work begins on this site, the contractor shall complete all work within twenty-one (21) calendar days. Liquidated damages in the amount of Five Hundred ($500.00) dollars per calendar day will be assessed for any work exceeding 21 calendar days minus any required watering of the sod. Liquidated damages in the amount of One Thousand ($1,000.00) dollars per calendar day will be assessed for any work not completed by the Final Completion outlined above minus any required watering of the sod. The City of Hiawatha, Iowa, does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction.

Award

Roads / Highways

$266,875.00

Public - City

Paving, Site Work

14

7

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
30
Bidding Soon
493
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Hiawatha, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.