Renovation of a fire / police facility in Moorpark, California. Completed plans call for the renovation of a 20,000-square-foot fire / police facility.

Ventura County Fire Protection District is soliciting bids to remove and replace the existing built-up roofing on both the existing Fire Station 42 building as well as the detached back-up dispatch building on-site. Fire Station 42 is located at: 295 East High Street, Moorpark, Ca 93021 Time of Bid Closure: The bid box will be closed promptly at the time specified above. The person opening bids will not accept bids that are not in the bid box at closing time. Note that clocks in the building may not be set to the correct time and should not be relied upon. Provisions when government offices are closed to the public are in the Bid Documents. General Description of the Work: The Work is defined by the Contract Documents. Contractors lump sum bid is inclusive of all labor, tools, materials, incidentals, equipment, supervision, management, administration, testing and all other services and things necessary to complete the Work. The Work for this project includes but not limited to the following Scope of Work and Services. Please see the Drawings for further details. All applicable specifications are on the Drawings and Division 7 Section 07550 in the Bid Documents. Remove and replace the existing built-up roofing on both the existing fire station building as well as the detached back-up dispatch building on-site. Protect in place items identified on plans including but not limited to; HVAC equipment and associated curbing, communication antenna and any associated supports, crickets and cant strips. Relocate, reuse and/or reseal items identified on the plans including but not limited to: crickets, sheet metal coping laps, condensate reservoirs, exhaust fan on/off switch and unistrut frames/flanges The roofing shall be Garland HPR Modified Bituminous Membrane Roofing per design, specification and detail, or approved equal. Furnish and install Bituminous Membrane Roofing 30 Year, Class A, ICC-ES Certified. 30-Year roof warranty must include materials and labor. Scheduling is an important part of this project. The following items should be considered within bids: The Owner understands that many roofing contractors that may bid on this project are extremely busy during the summer months assisting schools during their summer breaks. As such, our schedule goals are as follows: a. Award the project to the lowest responsible bidder in accordance with the bid timeline identified herein, b. Have the Contractor submit all material submittals as quickly as possible for review, c. Upon approval of submittals, Owner will issue a Notice-To-Proceed (NTP) for material purchases ONLY. d. Contract working days will not start until an NTP is issued for mobilization. That will not occur until the contractor has received the necessary materials to begin work. e. The owner expects NTP for mobilization to occur immediately after the summer school break, coinciding with the first week of September or earlier. f. The contract Working Days allotted for this project anticipate project completion prior to the Thanksgiving holiday. Roof HVAC units are planned to be replaced by Owner prior to the scope of work for this bid defined above. This will be done by others through a separate contract. However, some items such as curb heights may differ upon start of roofing construction. These, if any, will be addressed during the pre-construction meeting prior to mobilization. The fire station will remain in operation during construction. Means, methods and sequencing shall keep that as a priority throughout construction. The detached back-up dispatch building is equally as important to keep operational throughout construction. It is not operational on a daily basis but in the event of a wildfire, significant power outage or other unforeseen circumstances, it could be a manned facility that must remain operational. Awarded Contractor shall be solely responsible for the means and methods, procedures and all requirements to complete the Work for this Project. Contractor shall perform all Work in conformance with every law, statute, ordinance, building code, rule, or regulation and requirements of all City, County, State and Federal Agencies and Authorities having jurisdiction over this Project, including the demolition, removal, transportation and disposal of all removed materials. The Contractor shall furnish, provide, install, and maintain all required protective materials and coverings, medium, and services to adequately protect all areas of work during course of construction including maintenance of adequate dust control at all times, and thoroughly clean all areas of work at the end of each workday. Coordination of work with other trades shall be included as necessary. Recyclable Construction & Demolition Wastes (C & D): The site of this Project is within the incorporated City of Moorpark. Contractor shall comply with City of Moorpark's Construction and Demolition Waste Management Plan requirements. Qualifications and Competency of Bidders: It is the policy of Ventura County Fire Protection District to conduct business only with responsible contractors who possess trustworthiness, quality, and fitness to satisfactorily perform Fire District contracts. Fire District will investigate with reasonable diligence the responsibility of contractors submitting proposals before awarding, or recommending the award of, contracts. Complete the Questionnaire included in the Bid Documents package for Contractor/Bidder and submit with your bid. The bidding entity must have been established for a minimum of twelve consecutive months. Bidders shall possess a valid Class B California Contractors License, as defined by state law, and must maintain said license for the duration of the Project. The bidding entity, its Responsible Managing Owner (RMO) or its Responsible Managing Employee (RME), must have successfully completed at least three (3) projects that are of similar nature and complexity in accordance with accepted practices and standards. Provide a list of references by completing the List of Contractors Reference page of the bid documents. The bidding entity, its RMO, or its RME shall not have been removed from construction projects for failure to perform or default on contract within the past five (5) years. Successful removal from any project shall be considered possible cause for disqualification from this Project. Misrepresentation of submitted documentation by bidder shall constitute grounds for disqualification of its bid for this Project. Registration with Department of Industrial Relations (DIR): This project is subject to compliance monitoring and enforcement by DIR. Contractor and all subcontractors must comply with the requirements of Labor Code section 1771.1(a), pertaining to registration of contractors. Pursuant to 1771.1(a), a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work unless currently registered with the DIR pursuant to section 1725.5, with limited exceptions for bid purposes only. Contractor shall agree to comply with these sections and all remaining provisions of the Labor Code For Technical Questions and Requests for Information/Clarification concerning Bid Documents, send electronically to david.kirby@ventura.org and/or garett.salzer@ventura.org. Use the RFI form provided at the end of Division 1. Original to David Kirby Phone: (805) 914-4568 Email: david.kirby@ventura.org Copy to Garett Salzer Phone: (820) 426-0340 Email: garett.salzer@ventura.org The Contractor shall perform and complete in strict conformity with this Contract the Work as described and Shown in the Contract Documents for the Roof Replacement Project for Ventura County Fire Protection District's Fire Station 42 located at 295 E. High Street, Moorpark, CA 93021.

Bid Results

Fire / Police

$325,000.00

Public - County

Renovation

14

13

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
81
Bidding Soon
1,825
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.