Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Morton, Illinois. Contact the soliciting agency for additional information.
This is a Sources Sought Notice and is for market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION, OR BID. NO SOLICITATION IS CURRENTLY AVAILABLE. The U.S. Environmental Protection Agency (EPA) is conducting market research to determine if there are interested and capable offerors in the marketplace with the knowledge, skills and capability to perform the work described below. EPA intends to award one or more Architect-Engineer (A/E) Indefinite Delivery/Indefinite Quantity (IDIQ) contracts under this requirement with a target effective date of September 1, 2024. The A-E IDIQ will cover EPA regions 5 through 10 which include Region 5 - serving IL, IN, MI, MN, OH, and WI; Region 6 - serving AR, LA, NM, OK, and TX; Region 7 - serving IA, KS, MO, and NE; Region 8 - serving CO, MT, ND, SD, UT, and WY; Region 9 - serving AZ, CA, HI, NV, American Samoa, Commonwealth of the Northern Mariana Islands, Federated States of Micronesia, Guam, Marshall Islands, and Republic of Palau; and Region 10 - serving AK, ID, OR, WA and 271 native tribes. Each contract is expected to have a five-year base period and five 1-year option periods with a minimum order amount of $20,000.00 and a ceiling of $80,000,000.00. Task orders issued against the IDIQ contract will be Firm Fixed Price and firms will be expected to perform small and medium sized projects ($25,000 to $250,000). The applicable NAICS code is 541330 (Engineering Services) with a size standard of $25.5 million. The requirement is as follows: 1. Preliminary studies, fundamental design, final construction design and specifications, and follow-on services including construction quality control inspection for various construction and alteration projects. 2. Energy audits and feasibility studies, energy modeling, and independent commissioning. 3. Architectural and engineering studies and reports, control system reviews including sequence of operations and equipment performance compared with design requirements. 4. Revision of architectural and engineering drawings of various facilities to reflect modifications. 5. Development of site and utility plans, storm water management plans and retrofits (i.e. permeable paving design services), xeriscaping and natural landscaping design. 6. Structural analyses and feasibility studies, including green roof analysis and design services. 7. Incorporation of USGBC LEED Building Certification programs and sustainable design requirements into projects, as appropriate, and review of plans for compliance with all sustainable and LEED criteria. 8. Types of projects include, but are not limited to: a) Alterations and modifications to existing laboratory facilities; b) Heating and ventilating and air conditioning system modifications; c) Design of fire protection and detection systems; d) Electrical distribution system studies, evaluations and modifications; and e) Site improvements. 9. Environmental investigation support, including geotechnical investigations, characterization studies, remediation studies, and remedial design. 10. Preparation of plans and specifications for building demolition. 11. Strategic Planning, Comprehensive Space Analysis and Design Interested and qualified potential offerors should submit a capability statement to demonstrate their experience. Please include the following information in your response/narrative: (1) Company name, address, and point of contact information; (2) Identification and verification of the company's business status (i.e. Large, Small, Certified HubZone, 8(a), Service-Disabled Veteran-Owned, or Women-Owned Business; (3) Descriptions of Previous experience within the previous five (5) years on two (2) projects considered similar in technical scope and complexity to the proposed EPA project. Please include dates of work, references, project costs, and complexity of the projects; (4) A statement on the portion of the work that will be self-performed on this project, and how it will be accomplished. The successful contractor shall provide all necessary labor, materials, and services in support of the efforts. A draft copy of the SOW is included as an attachment in FedConnect. Interested parties with the capability of providing any of the services described in the draft SOW posted at the FedConnect website: https://www.fedconnect.net/ are invited to submit capability documents with sufficient information that clearly demonstrates their ability to provide the services described in the draft SOW, including personnel, experience and qualifications. A description of similar services previously or currently provided shall be provided. Standard company brochures will not be considered a sufficient response to this Sources Sought Synopsis. The EPA reserves the right to set this action aside for small businesses if it determines that there are two or more small businesses able to compete in terms of market prices, quality, and delivery. If set aside, a small business would be required to perform at least 50 percent of the direct labor costs incurred under the contract with its own personnel (FAR 52.219-14). Capability statements from small businesses should address their ability to meet this requirement. Responses to this sources sought announcement are to be sent via email to Mark Ingram, Contracting Officer, at ingram.mark@epa.gov, no later than 2:00 PM Eastern Time on Tuesday, March 12, 2024. All interested firms must register in the System for Award Management (SAM) to be eligible for award of Government contracts. Please see www.sam.gov for additional registration information. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Military
Public - Federal
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2025
Multiple Locations, Morton, IL
Related To This Project
Morton, IL
Bid Date: Mar 12 2024
Morton, IL
Bid Date: Mar 14 2024
Morton, IL
Bid Date: Mar 14 2024
Morton, IL
Bid Date: Mar 20 2024
Morton, IL
Bid Date: Mar 19 2024
Morton, IL
Bid Date: Mar 19 2024
Morton, IL
Bid Date: Mar 28 2024
Morton, IL
Bid Date: Mar 19 2024
Morton, IL
Bid Date: Feb 22 2024
Morton, IL
Bid Date: Mar 08 2024
Morton, IL
Bid Date: Jan 30 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Jan 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.