Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Roseville, California. Completed plans call for the renovation of a 14,000-square-foot educational facility.
PROJECT DESCRIPTION The Scope of Work for the Project consists of the following: Phase I - Demolition of existing concrete poured in place gymnasium. Estimated cost of $1,000,000. Plans anticipated available March 1, 2024. Phase II Increment 1 & 2 - Pre-construction services and construction of a competition pool, tennis courts and multi-story classroom building with site work. Estimated cost of $39,000,000 Post-construction lease of the facilities Anticipated Lease-Leaseback award: April 23, 2024 Estimated Lease Term including Post Construction: 43 months. March 26, 2024 - Deadline to submit questions. All Inquiries regarding Project Documents should be directed to DLR Group: DLR Group - Asawari Dandekar, Architect, AIA, 1050 20th Street, suite 250, Sacramento, CA 95811, 916-446-0206, adandekar@dlrgroup.com. The Scope of Work is divided into Construction Services for each of the Phases/Increments and Preconstruction Services for Phase II Increments 1 and 2. Commencement or completion of preconstruction services does not obligate the District to proceed with construction of Phase II, either Increment 1 or 2, with the selected LLB Entity. The Contractor shall, at a minimum, address: 1. Cut and fill operations. 2. Temporary stockpiles. 3. Vehicle and equipment storage, maintenance and fueling operations. 4. Concrete, plaster, mortar and paint disposal. 5. Dust control. 6. Tracking of dirt, mud on off-site streets. 7. Pipe flushing. Description / Anticipated Schedule Phase I: Refer to Drawings and Plans, Attachment B, available from ARC Northern California Planwell: https://customer.e-arc.com/arcEOC/PWELL_Main.aspmem=23 Phase I - Demolition of existing gymnasium and securing existing utilities The estimated cost of Phase I is $1,000,000. Respondents will submit a firm, fixed price for Phase 1 as part of their Proposal, which price shall include everything necessary for the completion of the Phase I Work. Demolition is anticipated to start on or about June 3, 2024, and Phase I construction is expected to be complete by August 2, 2024. Phase I is expected to include a nine-month post-construction leaseback period from September 2024 through May 2025. Phase II - Increment 1: New competition pool with support building and six tennis courts. Within the pool building are three bathrooms, pool equipment and storage, and possibly a maintenance office/workroom. Respondents will submit a fee proposal form based on an estimated direct cost of construction. The estimated cost of this Increment 1 is $9,000,000 This Increment is currently under design and DSA approval is expected December 2024. Construction is anticipated to start in early-March 2025 and be completed by January 2026 (10 month construction duration). Depending on weather, this increment may start immediately after Board approval of the Increment. If Increment 2 is not authorized by the District, then completion of construction of Increment 1 will be followed by a twelve-month leaseback period. Roseville Unified School District Lease-Leaseback RFP Page 3 of 18 Phase II - Increment 2: New two-story classroom building of approximately 14 classrooms, bathrooms, indoor and/or outdoor common areas, site upgrades, demolition of existing pool and support building, parking lot upgrades, and miscellaneous other utility, hardscape and landscape improvements. Respondents will submit a fee proposal form based on an estimated direct cost of construction. The estimated cost of Phase II, Increment 2 is $30,000,000. This Increment is currently under design and DSA approval is expected March 21, 2025 construction is expected to start early June 2025 and be completed by December 2026. Completion of construction will be followed by a twelve-month leaseback period.
Post-Bid
Educational
$40,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
June 3, 2024
1 Tiger Way, Roseville, CA
Related To This Project
Roseville, CA
Bid Date: Mar 18 2024
Roseville, CA
Bid Date: Mar 19 2024
Roseville, CA
Bid Date: Mar 12 2024
Roseville, CA
--
Roseville, CA
--
Roseville, CA
--
Roseville, CA
--
Roseville, CA
Bid Date: Apr 09 2024
Roseville, CA
Bid Date: Mar 07 2024
Roseville, CA
Bid Date: Feb 15 2024
Roseville, CA
--
Roseville, CA
Bid Date: Sep 28 2021
Roseville, CA
Bid Date: Sep 28 2021
Roseville, CA
Bid Date: Apr 28 2020
Roseville, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.