Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Columbia, Missouri. Completed plans call for the renovation of a water / sewer project.
The offeror hereby declares understanding, agreement and certification of compliance to provide the items and/or services, at the prices quoted, in accordance with all requirements and specifications contained herein. The offeror further agrees that the language of this RFP shall govern in the event of a conflict with their proposal. The offeror further agrees that upon receipt of an authorized purchase order from the Purchasing Division or when a Contract is signed and issued by an authorized official of the City of Columbia, a binding contract shall exist between the offeror and the City of Columbia. March 6, 2024 Close of written Requests for Additional Information. You are encouraged to submit your questions via e-mail. Autumn Klauba - Procurement Officer II Phone: (573) 817-5020 E-mail: autumn.klauba@como.gov. All materials provided by the contractor under the contract shall be new, current year models constructed of materials of high quality, which will give long life and reliable operation. All equipment shall be constructed of 304 stainless steel or greater corrosion resistant material. The contractor shall furnish all required mobilization, materials, equipment and tools to perform all necessary labor including supervision, to complete all work stipulated in the RFP, specifications, contract documents and other documents referred to herein (as altered, amended, or modified by all addenda hereto) for and in consideration of the prices stated herein. Upon the notice to proceed by the City, the contractor shall install the replacement pump station beginning no earlier than the month of April and lasting no longer than the month of November, only Mondays through Fridays. Throughout the installation period, the contractor shall also be responsible for traffic control. The contractor shall understand and agree that the City will dispose of the previous pump station after the replacement has been fully installed and successfully operational. The contractor shall further understand and agree that the City will provide bypass pumping for the duration of the contract. During the installation of the replacement pump station, the contractor shall be responsible for re-installing the existing pump station monitoring system and ensure proper operation of the monitoring system after the installation of the replacement pump station has been completed. Failure to do so will result in a deduction from payment of no less than $3,500. The contractor shall understand and agree that the City staff may accompany the contractor's staff who will be providing the installation for monitoring and inspection purposes. All neighboring sites shall be preserved and protected by the contractor during the entire duration of the construction process. The City reserves the right to stop the work at any time it feels correct measures are not being employed to protect neighboring sites. The contractor shall be notified to resume work after the necessary revisions are made. The contractor shall secure all necessary licenses and permits before beginning work, keep necessary records as required, and do all work in such manner as to comply with all ordinances and laws of the City, County, State, and Nation that apply to the work herein outlined. The contractor shall be responsible for repair of any accidental damage to City and/or private property. The contractor, at no charge to the City, shall complete all restoration of any accidental facility damage, caused by the contractor's activities. The contractor shall remove all mud and soil from the public roads, private drives and lots caused by the construction of the project. Question Deadline 03/06/2024 at 5:00 PM CT -You are encouraged to submit your questions via e-mail. Autumn Klauba - Procurement Officer II Phone: (573) 817-5020 E-mail: autumn.klauba@como.gov This document constitutes a request for competitive, sealed proposals for the provision of a replacement pump station for the Woodrail Wastewater Pump Station, including site work and installation for the City of Columbia, Missouri (hereinafter referred to as City) as set forth herein. Firm, Fixed Price for Purchase, Delivery, and Installation of Replacement Pump Station for the Woodrail Wastewater Pump Station. Pumps shall have 3 Horsepower (minimum), 3 phase with 230-volt motor; o Pumps shall have seal leak detection; o Pumps shall have three (3) inch discharge; o Pumps shall have duel stainless steel guide rails and stainless steel lifting chains; o Pumps shall have an above grade valve vault with a heated and insulated enclosure; and o Pumps shall have a minimum pumping capacity of eighty (80) gallons per minute. The control panel shall contain a terminal strip of dry contacts which shall be prewired for the monitoring of the pump running status, the pump fault, the high wet well level, and the low wet well level. The control panel shall match the brand and type of existing pump station control boxes for system compatibility and control continuity
Award
Water / Sewer
$97,987.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
April 1, 2024
1903 Woodhollow Dr, Columbia, MO
Related To This Project
Columbia, MO
Bid Date: Mar 07 2024
Columbia, MO
Bid Date: Mar 13 2024
Columbia, MO
Bid Date: Mar 07 2024
Columbia, MO
--
Columbia, MO
--
Columbia, MO
--
Columbia, MO
Bid Date: Mar 01 2024
Columbia, MO
Bid Date: Mar 20 2024
Columbia, MO
Bid Date: Mar 29 2024
Columbia, MO
Bid Date: Mar 19 2024
Columbia, MO
Bid Date: Mar 12 2024
Columbia, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.