BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Kingstree, South Carolina. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

This bid project includes construction of a unit of box hangars northwest of the existing nested T-Hangars. The new hangar unit will have overall dimensions of approximately 55 feet wide by 174 feet minimum to 290 feet maximum length. The base bid will include three box hangars, with two additive bids with one box hangar per bid. New asphalt apron area will also be constructed to provide access to and from the box hangar unit. Each box hangar will include electrical power, internal overhead lighting, light switches, electrical outlets, exterior lights over each hangar door, and electric bi-fold doors. Miscellaneous work items include demolition items, site grading and drainage, and erosion control. This project is funded under provisions of the Airport and Airway Safety and Capacity Act of 1987. Certain mandatory federal requirements apply to this solicitation and will be made a part of any contract awarded: (a) Presidents Executive Order No. 11246 as amended by 29 CFR Part 30 and 41 CFR Part 60. (b) Davis Bacon and Related Acts, 29 CFR Parts 1, 3 and 5. (c) Copeland Act, 29 CFR Part 3. (d) Contact Work Hours and Safety Standards Act. (e) Title VI of Civil Rights Act of 1964. (f) Disadvantage Business Enterprises (DBE) participation will be required as described in 49 CFR Part 23 and Part 26 and all pertinent amendments. The DBE goal for this project has been established to be 4.94%. All bidder questions must be received by end of day, February 27, 2024. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The best way to transmit the questions is via email. Email: bcagle@holtconsultingco.com with questions. Please include the drawing or specification that you are referencing in the questions.

Post-Bid

Transportation Terminals

$1,000,000.00

Public - County

New Construction, Site Work

42

19

7

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
55
Bidding Soon
664
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

To Be Determined, Kingstree, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.