BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Monroe, Louisiana. Completed plans call for the renovation of a municipal facility.

The CONTRACT DOCUMENTS, consisting of Advertisement for Bids, Information for Bidders, Bid Form, Bid Bond, Agreement, General Conditions, Payment Bond, Performance Bond, Drawings, Specifications, and Addenda, may be examined at the following location: City of Monroe Purchasing Division 1014 Grammont Street Monroe, LA 71201 The deposit for all other plans will be non-refundable. Bid documents are also available from the Architect in electronic form (pdf set) via email at no charge by emailing Bill@Land3.com. The goal for Disadvantaged Business Enterprise participation is 12.55% of the dollar value of this contract. All bidders and proposers shall make good faith efforts to subcontract to the greatest extent feasible to small business concerns owned and controlled by socially and economically disadvantaged businesses. Bidders submitting bids electronically must obtain copies of Bidding Documents from the design professional as indicated elsewhere herein. The OWNER reserves the right to reject any or all bids for just cause per State Public Bid Law. A corporate resolution authorizing a representative of the corporation to sign the bid must accompany the bid if the bidder is a corporation. Such activities will be in accordance with Title 38 of the Louisiana Revised Statues. Each bidder must deposit with his/her bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of Treasury Circular 570. The Attention of Bidders is called particularly to the requirements for conditions of employment to be observed and minimum wage rates to be paid under the Contract, Section 3, Segregated Facilities, Executive Order 11246, and all applicable laws and regulations of the Federal government and the State of Louisiana and bonding and insurance requirements. All Contractors bidding on this work shall comply with all provisions of the State Licensing Law for Contractors, LA RS 37:2150-2192, as amended, for all public contracts. It shall be the responsibility of the General or Prime Contractor to ensure that all subcontractors comply with this law. Contractors must hold an active license issued in the classification of MUNICIPAL AND PUBLIC WORK CONSTRUCTION as defined by the Louisiana State Licensing Board for Contractors. Contractors must provide their license number when requesting plans, specifications, and contract documents and place their license number on the face of the envelope containing their bid. No Bidders may withdraw his/her bid within Forty-Five (45) days after the actual date of the opening thereof. The Contractor shall begin mobilization and procurement of materials within ten (10) working days of the receipt of the Notice to Proceed. The successful bidder will be required to execute the Owners Standard Form of Agreement/Contract for construction together with the Performance and Payment Bond within ten (10) working days after the award of the contract. Any person with disabilities requiring special accommodations must contact the Owner no later than seven (7) days prior to bid opening CDBG Projects Only: the Successful Bidder Must Submit Executed Copies of Certification Regarding Equal Employment Opportunity, Section 3 and Segregated Facilities and Section 3 Plan With Tables a & B. Minority-owned Firms and Small Businesses Are Encouraged to Bid on This Project. If any discrepancies or conflicts should arise in connection with any matter covered by the Contract Documents, the question shall be submitted to the Architect who shall decide which provisions shall control before work proceeds on the item in question. Question Deadline 03/07/2024 Should the contractor or supplier have suggestions, questions or need clarifications, he shall notify the Architect at least 7 business days prior to Bids. Bill@Land3.com 318-322- 2694 ext.2

Award

Municipal

$247,000.00

Public - City

Renovation

9

17

4

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
133
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

May 13, 2024

img_map_placeholder

1401 Stubbs Ave, Monroe, LA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.