Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2024 at 8:00 PM
Updated April 11, 2024
Site work for a water / sewer project in Dalton, Georgia. Completed plans call for site work for a water / sewer project.
Removing SOLIDS from the Water Treatment Plant Sludge Lagoon by hydraulic dredging, creating a staging area for drying the material, transporting/disposing material to a designated facility. The work to be done (hereinafter referred to as "Work") consists of furnishing all materials and equipment, except those specified in the Bid, and performing all labor necessary for the following project (hereinafter referred to as "Project"): A bid bond will be required in the amount of 10% of the total bid amount. A contract performance bond and a payment bond, in an amount equal to one hundred percent (100%) of the contract price, will be required of the successful bidder. All work as specified herein shall be completed within 200 calendar days from notice to proceed. Contractors submitting bids on project must be prepared to proceed with work within three weeks of bid opening. The right is reserved to accept or reject any and all bids and to waive technicalities and informalities.
Post-Bid
Water / Sewer
$450,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
May 9, 2024
To Be Determined, Dalton, GA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
