BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rock Island, Illinois. Completed plans call for site work for a water / sewer project.

Questions regarding this bid request should be directed to Pat O'Brien, Utilities Maintenance Supervisor, 309-732-2330. This bid proposal is for All Stainless Steel Single Band and Multi-band Water Main Repair Clamps with the following minimum specifications (please check box next to specification if meets): The exterior band of the repair clamp shall be Type 304 (18-8) stainless steel. The repair clamp shall have a complete circle gasket permanently attached at the factory. The gasket shall be gridded in design and shall be composed of Virgin SBR (Styrene Butadiene Rubber) or NBR (Nitrile Butadiene Rubber) . The studs shall be welded to the stiffeners and the lugs welded to the band with austenitic 18-8 stainless steel rod. All welds shall have corrosion resistance equal to or greater than 18-8 stainless steel. The bands shall be constructed of a single section for sizes 1.25" through 12" and two sections for 16" size and two or three sections for 20" through 24". The lugs and nuts shall be of Type 304 (18-8) stainless steel with 1/2 " or 5/8" UNC Class 2 fit rolled threads. The tapped outlet, if required to be furnished on the repair clamp, shall be permanently fused to the repair clamp body by means of Heliarc welding and fully passivated. The clamp shall be chemically cleaned after welding to maintain the original passive state of the stainless steel. Type 304 (18-8) heavy gauge stainless steel lifter bar. All components of the pipe repair clamps in each size shall be adequate in size to withstand a minimum of 150 PSI when sealing a pipe opening of 6 square inches. The range of pipe O.D.'s, month and year of manufacture, and manufacturer's name shall be marked on the outside band surface. No paper or plastic labels attached to the clamp are allowed, all information shall be stenciled onto the clamp's surface.

Bid Results

Water / Sewer

$16,381.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
32
Bidding Soon
551
All Active Projects
273
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

April 22, 2024

img_map_placeholder

Multiple Locations, Rock Island, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.