BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2024 at 8:00 PM

Updated April 23, 2024

Site work and outdoor lighting for a bridge / tunnel in Wisconsin Rapids, Wisconsin. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

Decorative lighting for two downtown bridges across the Wisconsin River The Jackson St Bridge is 485 feet in length and the Grand Ave Bridge is -535 feet in length. The major approximately: quantities include 116 LED dome lighting fixtures 44 Linear LED luminaire, 3-foot lengths 22 Linear LED luminaire, 2-foot lengths o Electrical service, conduit, controllers, data drivers Bidder's Proof of Responsibility must be included in the electronic bid proposal Each electronic bid shall be accompanied by a bond, certified check, bank cashier's check, or bank draft for five percent (5%) of the amount of the bid, payable to the City of Wisconsin Rapids. The City of Wisconsin Rapids reserves. the right to reject any or all bids and waive informalities, and to make awards in such manner as may be deemed proper and in the best interest of the City. Removal of Bid Items The City reserves the right to remove any bid item from the contract when it determines the price is overly excessive and not realistic to work to be performed. Question Deadline 02/29/2024 Every request for such an interpretation shall be made in writing to the City Engineer

Award

Bridges / Tunnels

$602,935.00

Public - City

Outdoor Lighting, Site Work

12

11

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
9
Bidding Soon
558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

April 12, 2024

Project location map

W Jackson St & W Grand Ave, Wisconsin Rapids, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.