BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Adrian, Michigan. Completed plans call for the renovation of a educational facility.

2024 LISD Construction/Renovation - Flooring Replacement Projects Electrical Contractor Project: -William J. Ross Educational Service Center (ESC) Generator Replacement -Mechanical Contractor Project: -Laura Haviland Building HVAC Replacement -Collision Repair Prep Station (East Building, Tech Center) (2 separate contracts) -Paving Contractor Project: -Tech Center Campus -Center for a Sustainable Future (CSF) (Single contract for all work) -Flooring Replacement Contractor Project: -Porter Center Main Building Flooring Replacement -Trenton Hills Flooring Replacement (Single contract for all work) -General Contractor Projects: -Accessible Sink Modifications -District Wide Sidewalk Replacement -Laura Haviland Building Window Replacement -Trenton Hills Learning Center Window Replacement (4 separate contracts) A sworn and notarized Affidavit of compliance for the Iran Economic Sanctions Act certifying the contractor does and will comply with Public Act 517 of 2012 shall accompany all proposals. The Owner will not accept a proposal that does not include a sworn and notarized Affidavit of Compliance for the Iran Economic Sanctions Act. A form will be enclosed in the specification's booklet that shall be used for this purpose. A Bid Security in the amount of five percent (5%) is required and must be submitted with the bid prior to the bid due date. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Bids may not be withdrawn for a period of thirty (30) days after the bid date The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities and/or errors in the bid proposals which they feel to be in their own best interest. Questions and comments by Contractors for inclusion as Bidders shall be addressed to Todd Dailey, Dailey Engineering, Inc. by e-mail at todddailey@me.com.

Bid Results

Educational

$38,215.00

Public - County

Renovation

4

11

14

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
109
Bidding Soon
1,514
All Active Projects
662
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

img_map_placeholder

2946 Sutton Rd, Adrian, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.