Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a mixed-use development in San Marcos, Texas. Completed plans call for the renovation of a educational facility; for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
Reference Number 0000343793 Pursuant To The Provisions Of The Texas Government Code, Chapter 2269, Subchapter F, It Is The Intention Of The San Marcos Consolidated Independent School District To Select, Via One Step Method, Request For Proposals (Rfp), For The Selection Of One Or More Construction Manager-at-risk For: Smcisd 2023 Bond Projects Identified As: o 2023 Bond Middle School Renovations Project o 2023 Bond San Marcos High School Additions And Renovations Project o 2023 Bond Natatorium Project Question Deadline 03/22/2024 at 10:00 PM CT questions will be addressed unless provided in writing. All correspondence pertaining to this RFP should be addressed to: Mr. Jose C. Narvaez Director of Purchasing 631 Mill Stret San Marcos, Texas 78666 jose.narvaez@smcisd.net Mailing Address: P.O. Box 1087 Project includes: i. Goodnight Middle School: 1. Replace soil retainers; 2. Restripe and reseal parking lot; 3. Electrical replacement; 4. Band & Theater addition; and 5. PA replacement Goodnight Middle School Estimated Construction Commencement Date: July 1, 2024 d. Goodnight Middle School Estimated Substantial Completion Date: July 31, 2025 e. Goodnight Middle School Estimated Final Completion Date: August 30, 2025 f. Miller Middle School Estimated Construction Commencement Date: July 1, 2024 g. Miller Middle School Estimated Substantial Completion Date: July 31, 2025 h. Miller Middle School Estimated Final Completion Date: August 30, 2025 i. Estimated Construction Budget: Sixteen Million Four Hundred Twenty-Five Thousand Two Hundred Thirty-Nine and No/100 Dollars ($16,425,239.00) (2) 2023 Bond San Marcos High School Additions and Renovations Project a. VLK Architects, Inc. a corporation of the State of Texas b. Project includes: i. Partial Mechanical Replacement; ii. Classroom Additions; iii. Campus Entry Renovations - Enhance Safety; iv. Fine Arts Additions; v. Site Circulation; vi. HVAC Rooftop Units; vii. Condensing Unit Upgrades; and viii. Lighting Replacements c. Estimated Construction Commencement Date: January 6, 2025 d. Estimated Substantial Completion Date: May 22, 2026 e. Estimated Final Completion Date: June 21, 2026 f. Estimated Construction Budget: Thirty-Two Million Five Hundred Twenty-Six Thousand Six Hundred Seventeen and No/100 Dollars ($32,526,617.00) (3) 2023 Bond Natatorium Project a. Architect: Stantec Architecture, Inc., a North Carolina corporation b. The Natatorium is anticipated to be a facility of approximately 18,000 square feet. The location will be on the same property as the San Marcos High School. It is anticipated that site work will be required for building accessibility, including ADA parking. c. Estimated Construction Commencement Date: May 15, 2024 d. Estimated Substantial Completion Date: May 30, 2025 e. Estimated Final Completion Date: June 29, 2025 f. Estimated Construction Budget: Fourteen Million Seven Hundred Fifty Thousand and No/100 Dollars ($14,750,000.00)
Post-Bid
Educational
$2,500,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
December 2, 2024
Multiple Locations, San Marcos, TX
Related To This Project
San Marcos, TX
--
San Marcos, TX
--
San Marcos, TX
Bid Date: Apr 05 2024
San Marcos, TX
--
San Marcos, TX
Bid Date: Mar 21 2024
San Marcos, TX
--
San Marcos, TX
--
San Marcos, TX
--
San Marcos, TX
Bid Date: Sep 11 2024
San Marcos, TX
--
San Marcos, TX
--
San Marcos, TX
Bid Date: Feb 27 2024
San Marcos, TX
--
San Marcos, TX
--
San Marcos, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.