BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in San Marcos, Texas. Completed plans call for the renovation of a educational facility; for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Reference Number 0000343793 Pursuant To The Provisions Of The Texas Government Code, Chapter 2269, Subchapter F, It Is The Intention Of The San Marcos Consolidated Independent School District To Select, Via One Step Method, Request For Proposals (Rfp), For The Selection Of One Or More Construction Manager-at-risk For: Smcisd 2023 Bond Projects Identified As: o 2023 Bond Middle School Renovations Project o 2023 Bond San Marcos High School Additions And Renovations Project o 2023 Bond Natatorium Project Question Deadline 03/22/2024 at 10:00 PM CT questions will be addressed unless provided in writing. All correspondence pertaining to this RFP should be addressed to: Mr. Jose C. Narvaez Director of Purchasing 631 Mill Stret San Marcos, Texas 78666 jose.narvaez@smcisd.net Mailing Address: P.O. Box 1087 Project includes: i. Goodnight Middle School: 1. Replace soil retainers; 2. Restripe and reseal parking lot; 3. Electrical replacement; 4. Band & Theater addition; and 5. PA replacement Goodnight Middle School Estimated Construction Commencement Date: July 1, 2024 d. Goodnight Middle School Estimated Substantial Completion Date: July 31, 2025 e. Goodnight Middle School Estimated Final Completion Date: August 30, 2025 f. Miller Middle School Estimated Construction Commencement Date: July 1, 2024 g. Miller Middle School Estimated Substantial Completion Date: July 31, 2025 h. Miller Middle School Estimated Final Completion Date: August 30, 2025 i. Estimated Construction Budget: Sixteen Million Four Hundred Twenty-Five Thousand Two Hundred Thirty-Nine and No/100 Dollars ($16,425,239.00) (2) 2023 Bond San Marcos High School Additions and Renovations Project a. VLK Architects, Inc. a corporation of the State of Texas b. Project includes: i. Partial Mechanical Replacement; ii. Classroom Additions; iii. Campus Entry Renovations - Enhance Safety; iv. Fine Arts Additions; v. Site Circulation; vi. HVAC Rooftop Units; vii. Condensing Unit Upgrades; and viii. Lighting Replacements c. Estimated Construction Commencement Date: January 6, 2025 d. Estimated Substantial Completion Date: May 22, 2026 e. Estimated Final Completion Date: June 21, 2026 f. Estimated Construction Budget: Thirty-Two Million Five Hundred Twenty-Six Thousand Six Hundred Seventeen and No/100 Dollars ($32,526,617.00) (3) 2023 Bond Natatorium Project a. Architect: Stantec Architecture, Inc., a North Carolina corporation b. The Natatorium is anticipated to be a facility of approximately 18,000 square feet. The location will be on the same property as the San Marcos High School. It is anticipated that site work will be required for building accessibility, including ADA parking. c. Estimated Construction Commencement Date: May 15, 2024 d. Estimated Substantial Completion Date: May 30, 2025 e. Estimated Final Completion Date: June 29, 2025 f. Estimated Construction Budget: Fourteen Million Seven Hundred Fifty Thousand and No/100 Dollars ($14,750,000.00)

Post-Bid

Educational

$2,500,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
28
Bidding Soon
2,326
All Active Projects
905
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.