BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Longview, Texas. Completed plans call for site work for a water / sewer project.

Waterline Relocation for Delia Drive Realignment Project. The Successful Bidder or Bidders Will Be Required to Furnish a Performance Bond, Payment Bond, and Maintenance Bond, in the Amount of the Contract, Written by a Responsible Surety Company Authorized to Do Business in the State of Texas, and Satisfactory to the Owner as Required By Article 5160 V.a.t.c.s. A Certified or Cashier's Check, or an Acceptable Bid Bond in an Amount Not Less Than Five Percent (5%) of the Base Bid Shall Accompany Each Bid as a Guaranty That, if Awarded the Contract, the Bidder Will Promptly Enter Into Contract With the City of Longview, Texas and Furnish Bonds on the Forms Provided. Estimate: $218,000.00 Bidders Are Expected to Inspect the Site of the Work and to Inform Themselves of All Local Conditions. Time of Completion Shall Be 120 Calendar Days, Including Saturdays, Sundays, and Legal Holidays. Installation of approximately 700 LF of 12" waterline, dry bore pit for 34 LF of 20" steel encasement, tap existing 12" main with TS&V, and 44 LF of open cut at Delia Drive x-ing. The bidder must agree to pay, as liquidated damages, the sum of $520.00 for each consecutive calendar day thereafter as hereinafter provided for in the General Conditions. In Case of Ambiguity or Lack of Clearness Stating the Price in the Bids, the Owner Reserves the Right to Consider the Most Advantageous Construction Thereof or to Reject the Bid. The Owner Reserves the Right to Reject Any or All Bids, Waive Any or All Informalities, and to Award the Contract to the Bidder or bidders who, in the opinion of the Owner, offers the proposal to the best interest of same. The bidder must agree to pay, as liquidated damages, the sum of $520.00 for each consecutive calendar day thereafter as hereinafter provided for in the General Conditions. Time of completion shall be 120 calendar days, including Saturdays, Sundays, and legal holidays.

Award

Water / Sewer

$178,041.00

Public - City

Site Work

10

12

2

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
23
Bidding Soon
375
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

April 26, 2024

img_map_placeholder

Delia Dr, Longview, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.