BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Stover, Missouri. Completed plans call for site work for a water / sewer project.

Stover Wastewater Collection System Improvements The Engineer will consider such questions submitted in writing at least 10 days prior to bid opening. If the question includes the equality or use ofproducts or methods, it must be accompanied by drawing, specifications, and any other necessary data to allow the Engineer to make a decision regarding the equality of the project or method. Such requests will only be considered from general contractors known to the bidding on the project. Each proposal shall, as a guarantee of good faith on the part of the bidder, be accompanied by a Cashier's Check or a Certified Check drawn on an acceptable Missouri Bank or Trust Company, or an acceptable Bid Bond, issued by a surety licensed to conduct business in the State of Missouri; in an amount of not less than five (5) percent of the total bid. The Bid Bond shall be made payable without condition to The contractor to whom the work is awarded will be required to furnish a separate Construction Contract Performance Bond and Construction Contract Payment Bond to the owner each in an amount equal to 100 percent (100%) of the amount of the Contract so awarded. Insurance of the kinds and minimum limits will be required to be carried by the Contractor and his subcontractors in accordance with the provisions of the General and Supplemental Conditions, during the lifetime of this Contract. Insurance coverage shall include provisions requiring notification to Owner if coverage is terminated during course of project. The Owner and MECO Engineering Company, Inc. shall be named as additional insured and certificate holder as part of the insurance requirements for this project. Certification of insurance coverage shall be filed with the Engineer and acceptable to the Owner. The City of Stover reserves the right to reject any and all bids and to waive all informalities in the bids. No bids may be withdrawn for a period of ninety (90) days subsequent to the specified time for receipt of bids.

Bid Results

Water / Sewer

$1,797,142.00

Public - City

Site Work

16

12

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
29
Bidding Soon
379
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Stover, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.