Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Stover, Missouri. Completed plans call for site work for a water / sewer project.
Stover Wastewater Collection System Improvements The Engineer will consider such questions submitted in writing at least 10 days prior to bid opening. If the question includes the equality or use ofproducts or methods, it must be accompanied by drawing, specifications, and any other necessary data to allow the Engineer to make a decision regarding the equality of the project or method. Such requests will only be considered from general contractors known to the bidding on the project. Each proposal shall, as a guarantee of good faith on the part of the bidder, be accompanied by a Cashier's Check or a Certified Check drawn on an acceptable Missouri Bank or Trust Company, or an acceptable Bid Bond, issued by a surety licensed to conduct business in the State of Missouri; in an amount of not less than five (5) percent of the total bid. The Bid Bond shall be made payable without condition to The contractor to whom the work is awarded will be required to furnish a separate Construction Contract Performance Bond and Construction Contract Payment Bond to the owner each in an amount equal to 100 percent (100%) of the amount of the Contract so awarded. Insurance of the kinds and minimum limits will be required to be carried by the Contractor and his subcontractors in accordance with the provisions of the General and Supplemental Conditions, during the lifetime of this Contract. Insurance coverage shall include provisions requiring notification to Owner if coverage is terminated during course of project. The Owner and MECO Engineering Company, Inc. shall be named as additional insured and certificate holder as part of the insurance requirements for this project. Certification of insurance coverage shall be filed with the Engineer and acceptable to the Owner. The City of Stover reserves the right to reject any and all bids and to waive all informalities in the bids. No bids may be withdrawn for a period of ninety (90) days subsequent to the specified time for receipt of bids.
Bid Results
Water / Sewer
$1,797,142.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2024
May 6, 2024
Multiple Locations, Stover, MO
Related To This Project
Stover, MO
Bid Date: Apr 15 2024
Stover, MO
Bid Date: Mar 21 2023
Stover, MO
Bid Date: Feb 27 2023
Stover, MO
Bid Date: Feb 16 2023
Stover, MO
Bid Date: Mar 15 2022
Stover, MO
Bid Date: Jun 30 2022
Stover, MO
Bid Date: Aug 10 2022
New London, MO
Bid Date: Mar 04 2024
Rolla, MO
Bid Date: Mar 12 2024
Rolla, MO
Bid Date: Mar 12 2024
Saint Louis, MO
Bid Date: Apr 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.