BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cottleville, Missouri. Completed plans call for site work for a water / sewer project.

The Scope of Work for the Project includes CIPP lining of approximately 19,000 feet of sanitary sewer line 8-inches and 15-inches in diameter. The work includes hydraulic root cutting and cleaning, grinding protruding break-in service connections, remote televising and recording of the sewer. All project locations will be within the Owner service area. Direct all questions to Kevin Hampe at khampe@colestl.com All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after March 15, 2024 may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Wages shall be paid to each employee engaged in the work at a rate not less than the prevailing rate of wages for the particular trade or occupation, as issued by the Missouri Department of Labor and Industrial Relations. The Contractor shall be responsible for complying with the prevailing rate of wages for St. Charles County, Missouri. The Contractor shall be responsible for complying with Missouri Immigration Laws, and must submit the Work Authorization Affidavit with Bid. Contractor shall provide a ten hour Occupational Safety and Health Administration (OSHA) construction safety program for its employees working onsite on the project, as described in Section 800. THE OWNER INTENDS TO AWARD THE CONTRACT TO THE MOST RESPONSIVE, RESPONSIBLE BIDDER SUBMITTING THE LOWEST BID. THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, AND TO WAIVE ANY INFORMALITIES NOT INVOLVING PRICE, TIME OR CHANGES IN THE WORK IN THE BEST INTEREST OF THE OWNER

Award

Water / Sewer

$1,147,480.00

Public - County

Site Work

15

13

3

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
43
Bidding Soon
828
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Cottleville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.