Published March 27, 2024 at 8:00 PM

Updated March 28, 2024

This is a service / maintenance or supply contract in Roswell, Georgia. Contact the soliciting agency for additional information.

Clean and restore the invert to ensure that all voids surrounding, beneath, and adjacent to the pipes are filled and lined with Corrugated Metal Pipe (CMP), using either Cure-In-Place Pipe (C.I.P.P.) or Structural Concrete. A 54" C.M.P Pipe #SWP 9013 is utilized, with sections separated by a blind junction box. This junction box needs to be brought to grade and have a manhole installed, along with an internal coating of structural concrete liner. Furthermore, an additional manhole must be installed at the downstream end, constructed according to GDOT standards to accommodate an existing sewer line crossing the center of the pipe. (24" C.M.P. Pipe #SWP 7168; 24" C.M.P. Pipe #SWP 884; 18" C.M.P. Pipe SWP 9014) Additionally, repair any grassed areas with suitable sod and restore any disturbed landscape areas to their pre-construction state. Pre-Qualified Stormwater Lining Contractors for the construction Branch Valley Way Stormwater Lining Project This project involves a single location and encompasses tasks such as cleaning and restoring the invert to ensure that all voids surrounding, beneath, and adjacent to the pipes are filled and lined with Corrugated Metal Pipe (CMP), using either Cure-In-Place Pipe (C.I.P.P.) or Structural Concrete. Additionally, repair any grassed areas with suitable sod and restore any disturbed landscape areas to their pre-construction state. Appropriate signage, flagging, flag personnel, barriers, and other necessary safety equipment must be provided as needed. Question Deadline 03/11/2024 at 5:00 PM ET, location : online portal. Exactly 60 calendar days have been set aside for performance of the contract. Liquidated damages have been set at $500 per calendar day in accordance with the General and Supplemental Conditions. A Bid Bond in the amount of 5% is required. Payment and Performance bonds equal to 100% of the Awarded Contract value are required. The City reserves the right to reject any one or all bids. A Pre-Bid conference is not planned as of the date of advertisement.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
205
Bidding Soon
2,286
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

April 29, 2024

Project location map

Branch Valley Way, Roswell, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.