Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 27, 2024 at 7:00 PM
Updated March 1, 2024
This is a service / maintenance or supply contract in Garland, Texas. Contact the soliciting agency for additional information.
Mark Outside of Envelope: Pipeline Row and Pond Maintenance Project Description The project involves clearing trees, shrubs, and other vegetation to reclaim the Right-of-Way (ROW) within 5 feet on each side of the City of Garland operated pipeline. The pipeline spans roughly 5 miles and goes through fields, residential and commercial properties 1. ROW Reclamation * Description: Reclaim approximately 5 miles of right-of-way (ROW) vegetation from the Ray Olinger Plant site plant at Lavon Lake to the valve site located at coordinates 33.092834, -96.368253. * Scope: Reclamation of vegetation along the entire 5-mile stretch. All road crossings, sign markers, and cathodic protection sites will be mowed, trimmed, and cleared of vegetation. 2. On-site Plant Vegetation Services * Description: Eliminate vegetation within the GP&L plant premises. * Scope: Remove all trees and vegetation along the riprap of the outfall structures on the west side of the plant. Treat cut-stumps with triclopyr or an equivalent herbicide. 3. Ponds 1-4 Vegetation Management * Description: Manage vegetation around Ponds 1-4. * Scope: Remove all trees along the banks of the ponds. Mow and trim all grasses and brush along the banks. Grind stumps from the removed trees 2 inches below grade to facilitate future maintenance. Questions and Answer Period: Any questions pertaining to this request must be submitted through electronically no later than February 23, 2024 at 5:00pm. The City is not obligated to and may at its own discretion choose not to accept or answer questions received after that date.
Post-Bid
Conservation and Development
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
March 29, 2024
Multiple Locations, Garland, TX
Related To This Project
Garland, TX
Bid Date: Mar 19 2024
Garland, TX
Bid Date: Mar 19 2024
Garland, TX
Bid Date: Mar 05 2024
Garland, TX
Bid Date: Mar 07 2024
Garland, TX
Bid Date: Mar 12 2024
Garland, TX
Bid Date: Mar 14 2024
Garland, TX
Bid Date: Apr 23 2024
Garland, TX
Bid Date: Mar 26 2024
Garland, TX
Bid Date: Mar 18 2024
Garland, TX
Bid Date: Sep 30 2024
Garland, TX
Bid Date: Feb 29 2024
Garland, TX
Bid Date: Feb 20 2024
Garland, TX
Bid Date: Feb 20 2024
Garland, TX
Bid Date: Mar 28 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed