BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Westminster, Colorado. Completed plans call for the renovation of a educational facility.

Reference Number 0000343970 Job Location: FRCC Westminster Campus Building Front Range Community College has received a Controlled Maintenance Project from the State of Colorado to replace the existing Lighting Control System at the Westminster Campus. The current system is obsolete. The scope includes the replacement of all existing relay-based lighting control panels with new relay panels. Adding a new lighting control panel on A Level. Replace existing override switches, photocell for daylight zones. Added new control locations. Per Construction Documents and Specifications prepared by Cator Ruma and Associates dated February 23, 2024 the scope of services includes but limited to the demolition/removal of existing lighting control system and the installation of a complete new lighting control system. The work of this Contract, except as otherwise specified, shall include all labor, materials, equipment, and facilities necessary to produce the required result, all transportation and services, and all materials and equipment incorporated and intended to be incorporated in such results. The Work includes all fees, taxes, permit costs, insurance premiums, and costs for overhead, superintendence, temporary facilities, and other direct and indirect costs and expenses incidental to the performance of the Work. Question Acceptance Deadline 03/12/2024 02:00 PM MT Questions are submitted online Yes, Point of Contact/Clarification Name: Stephen Graziano, Managing Architect Agency: Front Range Community College Phone: 303-404-5161 Email: Stephen.graziano@frontrange.edu Notice of Award March 29, 2024 Anticipated General/Electrical Contractor Start May 2024 Estimated Construction Cost: $200,000.00 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

Award

Educational

$200,000.00

Public - State/Provincial

Renovation

29

8

6

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
994
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

May 1, 2024

img_map_placeholder

3645 W 112th Ave, Westminster, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.