Site work for a water / sewer project in Sherman, New York. Completed plans call for site work for a water / sewer project.

The Village of Sherman (Owner) is requesting Bids for the construction of the following Project: Main Street Storm water Infrastructure Improvements. The Project includes the following Work: Contract No. 1 - General Construction: Work under this contract generally consists of the removal and disposal of existing storm water infrastructure pipes and drainage inlets, installation of new storm water drainage inlets and pipes ranging in diameter from 12" to 36" along/adjacent to East and West Main Streets, and associated paving and surface restoration of disturbed areas. For information concerning the proposed Work, contact Sterling DePaul via email at sdepaul@bartonandloguidice.com and copy Nicole Cleary at ncleary@bartonandloguidice.com. There will be no pre-bid conference for this project. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security, as prescribed in the Instructions to Bidders. The Successful Bidder will be required to furnish the additional bond(s) prescribed in the Bidding Documents. In order to perform public work, the Successful Bidder and Subcontractors prior to contract award shall hold or obtain such license as required by State statutes, and Federal and local Laws and Regulations. Bids will not be accepted from Bidders that have been barred from competing on public works under General Municipal Law 5A-103-b. Purchases made by the Village of Sherman are not subject to any Federal, State or local sales tax. Bidders shall not include in their bid sales and compensating use taxes on the cost of materials. Exemption certificates will be executed upon request. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Village of Sherman strongly encourages Minority and Women Owned Business Enterprises and Section 3 Firms to apply. Document note: Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record for notification of addendums. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. For information concerning the proposed Work, contact Sterling DePaul via email at sdepaul@bartonandloguidice.com and copy Nicole Cleary at ncleary@bartonandloguidice.com. The Section 3 Participation Goals for this project are: a. 25% of Total Labor Hours on the Project worked by Section 3 Workers, including b. 5% of Total Labor Hours on the Project worked by Targeted Section 3 Workers. c. 30% of the new hires be Section 3 residents Question Deadline 03/13/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Nicole Cleary, Managing Landscape Architect, ncleary@bartonandlogudice.com B. Sterling DePaul, Project Engineer, sdepaul@bartonandloguidice.com Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$1,078,899.00

Public - City

Site Work

33

18

4

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Sanitary Sewerage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Dies
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
76
Bidding Soon
1,052
All Active Projects
457
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

April 22, 2024

img_map_placeholder

W Main St, Sherman, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Main Street Stormwater Infrastructure Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.