BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2024 at 8:00 PM

Updated March 30, 2024

Site work for a mixed-use development in Maineville, Ohio. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The Simpson Creek Headwaters Restoration at Landen-Deerfield Park project proposes to create a signature project in a highly visited and visible park that will deliver multiple benefits in the areas of pollutant removal, storm water management, wildlife habitat enhancement, environmental education, passive recreation, and infrastructure. It will reestablish an important headwater stream and tributary to the Little Miami River, a designated State and National Wild and Scenic River and one of Ohio EPA's defined Outstanding State Waters. Statements of Qualifications shall be addressed to Matt Latham, CEO Email: parks@co.warren.oh.us. The project will modify an existing and degraded impoundment (the 2.8-acre LandenDeerfield Park Lake) to reintroduce wetland habitat, natural channel function, vernal pools, and riparian buffers after 40+ years of inundation. Rehabilitation is expected to increase aquatic and terrestrial species diversity, abundance, and richness while reintroducing aquatic functions in a watershed situated within one of the most heavily used public parks in Warren County. Proposed features include up to 0.8 acres of native wetland habitat and vernal pools, up to 900 linear feet of intermittent/headwater stream reestablishment, 1.5 acres of riparian habitat establishment, 2.8 acres of upland buffer establishment, and an approximately 0.5-acre extant pond feature that incorporates a native littoral shelf, or wetland fringe. Crushed limestone access paths, a boardwalk/ observation platform, interpretive signage, and nature play elements will enable tens of thousands of park visitors annually to interact with the restored stream and access educational opportunities. Project Location: 2258 US-22, Maineville, OH 45039 Award of Contract April 17, 2024 (Board of Park. DB Services Start May 2024 Construction Stage Start April 2025 Construction Stage Completed Late October 2025 DB Services Completed December 2025

Post-Bid

Playgrounds / Parks / Athletic Fields

$923,179.00

Public - County

Site Work

3

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
0
Bidding Soon
1,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

May 1, 2024

Project location map

2258 US-22, Maineville, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.