Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Demolition, site work, paving, renovation and addition to a mixed-use development in Humble, Texas. Completed plans call for the renovation of a 170,100-square-foot educational facility; for the addition of a educational facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.
As of October 10, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. As of March 29, 2024, an architect has been selected. Information on the general contractor has not been released. A firm construction timeline has not been established at this point in time. Project no- C23-025-00, 2006-03 Project Description We understand that this project consists of the proposed renovations to the existing Timberwood Middle School campus of the Humble Independent School District (ISD), located at 18450 Timber Forest Drive in Humble, Texas. A vicinity map of the project site is provided on Plate 1 in the Appendix of this report. The layout of the existing site and the proposed building and parking lots and driveways are shown on Plate 2 in the Appendix. Based on information provided by the, we understand the proposed renovations to the existing Timberwood Middle School campus consists of the following: A building addition on the east side of the existing campus building to house a practive gym, a dance hall and a weight room. We anticipate that the proposed building will be a single story wood or steel frame structure, with CMU facade. We estimate that the column loads will be on the order of about 50 to 150 kips, with floor pressures on the order of about 125 psf. Finished floor elevation (FFE) of the proposed structures are anticipate to match those of the existing building. Relocation of the existing track further east, including construction of the new concession stand building. We anticipate that understand the reconstruction will include removal of the existing ones and prepare the subgrade with a designed potential vertical movement (PVR) of one inch or less, followed by the placement of a new track system. Construction of a fire lane.
Award
Educational
$13,900,000.00
Public - City
Addition, Demolition, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
October 1, 2025
18450 Timber Forest Dr, Humble, TX
Related To This Project
Humble, TX
Bid Date: Apr 04 2024
Humble, TX
Bid Date: Jun 04 2024
Humble, TX
--
Humble, TX
Bid Date: Jan 28 2025
Humble, TX
--
Humble, TX
--
Humble, TX
--
Humble, TX
--
Humble, TX
Bid Date: Apr 25 2024
Humble, TX
Bid Date: Mar 14 2024
Humble, TX
Bid Date: Oct 22 2024
Humble, TX
Bid Date: Feb 28 2024
Humble, TX
Bid Date: Apr 02 2024
Humble, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
