BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Demolition, site work, paving, renovation and addition to a mixed-use development in Humble, Texas. Completed plans call for the renovation of a 170,100-square-foot educational facility; for the addition of a educational facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

As of October 10, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. As of March 29, 2024, an architect has been selected. Information on the general contractor has not been released. A firm construction timeline has not been established at this point in time. Project no- C23-025-00, 2006-03 Project Description We understand that this project consists of the proposed renovations to the existing Timberwood Middle School campus of the Humble Independent School District (ISD), located at 18450 Timber Forest Drive in Humble, Texas. A vicinity map of the project site is provided on Plate 1 in the Appendix of this report. The layout of the existing site and the proposed building and parking lots and driveways are shown on Plate 2 in the Appendix. Based on information provided by the, we understand the proposed renovations to the existing Timberwood Middle School campus consists of the following: A building addition on the east side of the existing campus building to house a practive gym, a dance hall and a weight room. We anticipate that the proposed building will be a single story wood or steel frame structure, with CMU facade. We estimate that the column loads will be on the order of about 50 to 150 kips, with floor pressures on the order of about 125 psf. Finished floor elevation (FFE) of the proposed structures are anticipate to match those of the existing building. Relocation of the existing track further east, including construction of the new concession stand building. We anticipate that understand the reconstruction will include removal of the existing ones and prepare the subgrade with a designed potential vertical movement (PVR) of one inch or less, followed by the placement of a new track system. Construction of a fire lane.

Award

Educational

$13,900,000.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

211

30

5

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
423
Active Projects
248
Bidding Soon
3,435
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

October 1, 2025

Project location map

18450 Timber Forest Dr, Humble, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.