BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Joint Base Lewis McChord, Washington. Conceptual plans call for site work for a transportation facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a transportation facility.

A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Disabled Veteran Owned Business and you are interested in this project please respond appropriately. Construct a microgrid system at Joint Base Lewis-McChord (JBLM) Gray Army Airfield (GAAF) powered by natural gas-fired (NG) Reciprocating Internal Combustion Engine(RICE) generators totaling approximately 3.2 Mega Watt (MW) of generation and approximately 4 MW / 4 MWh Energy Storage System (BESS). Generator(s) will include sound reducing enclosure(s). In addition to the generating equipment and the BESS, the system will consist of automated isolating switchgear to form the microgrid and paralleling switchgear for the generators, as well as other microgrid controls. The microgrid control system will provide automated switching that will be transmitted thru radio signals for the microgrid generators and isolation points. Installation of smart grid control technology will also be required. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs, and gutters, storm drainage, landscaping, and signage. The ESS will provide continuous power to critical flight operation for up to an hour during microgrid start-up and/or when generators need maintenance or repair. The information system infrastructure for this microgrid is a stand-alone internal control system with no connection to NEC managed Installation Campus Area Network (iCAN). The information system will ensure that the isolation switches are activated and that the generators can provide power to the microgrid, all internally to the microgrid system itself. Contract duration is estimated at 730 calendar days. The estimated cost range is between $25,000,000 to $100,000,000. NAICS code is 237130. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses or Service Disabled Veteran Owned Business contractors should respond to this survey by email on 12 March 2024 by 2:00 PM Eastern Time. Responses should include: 1. Identification and verification of the company's small business status. 2. Contractor's Unique Identifier Number and CAGE Code(s). 3. Documentation from the firm's bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience - Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance. Example projects must be of similar size and scope. a. Projects similar in scope to this project include: Construction of a new microgrid system which involves following elements: 1. Natural Gas (NG) centralized generators 2. Battery energy storage systems (BESS) 3. Microgrid with automated islanding option 4. Successful Black Start of microgrid systems 5. Installation of natural gas lines 6. Installation of smart grid control technology b. Projects similar in size to this project include: 1. Installation and commissioning of multiple Reverse Internal Combustion Engine (RICE)generator(s) totaling 3 MW or greater output 2. 2.0 MW/MWh or greater battery energy storage system (BESS) with microgrid c. Based on the information above, for each project submitted, include: Current percentage of construction complete and the date when it was or will be completed. Scope of the project. Size of the project. The dollar value of the construction contract and whether it was design-bid build or design-build. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm's own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. Description: A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Disabled Veteran Owned Business and you are interested in this project please respond appropriately. Construct a microgrid system at Joint Base Lewis-McChord (JBLM) Gray Army Airfield (GAAF) powered by natural gas-fired (NG) Reciprocating Internal Combustion Engine(RICE) generators totaling approximately 3.2 Mega Watt (MW) of generation and approximately 4 MW / 4 MWh Energy Storage System (BESS). Generator(s) will include sound reducing enclosure(s). In addition to the generating equipment and the BESS, the system will consist of automated isolating switchgear to form the microgrid and paralleling switchgear for the generators, as well as other microgrid controls. The microgrid control system will provide automated switching that will be transmitted thru radio signals for the microgrid generators and isolation points. Installation of smart grid control technology will also be required. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs, and gutters, storm drainage, landscaping, and signage. The ESS will provide continuous power to critical flight operation for up to an hour during microgrid start-up and/or when generators need maintenance or repair. The information system infrastructure for this microgrid is a stand-alone internal control system with no connection to NEC managed Installation Campus Area Network (iCAN). The information system will ensure that the isolation switches are activated and that the generators can provide power to the microgrid, all internally to the microgrid system itself. Contract duration is estimated at 730 calendar days. The estimated cost range is between $25,000,000 to $100,000,000. NAICS code is 237130. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Businesses or Service Disabled Veteran Owned Business contractors should respond to this survey by email on 14 March 2024 by 2:00 PM Eastern Time. Responses should include: 1. Identification and verification of the company's small business status. 2. Contractor's Unique Identifier Number and CAGE Code(s). 3. Documentation from the firm's bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience - Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages, and quality of performance. Example projects must be of similar size and scope. a. Projects similar in scope to this project include: Construction of a new microgrid system which involves following elements: 1. Natural Gas (NG) centralized generators 2. Battery energy storage systems (BESS) 3. Microgrid with automated islanding option 4. Successful Black Start of microgrid systems 5. Installation of natural gas lines 6. Installation of smart grid control technology b. Projects similar in size to this project include: 1. Installation and commissioning of multiple Reverse Internal Combustion Engine (RICE)generator(s) totaling 3 MW or greater output 2. 2.0 MW/MWh or greater battery energy storage system (BESS) with microgrid c. Based on the information above, for each project submitted, include: Current percentage of construction complete and the date when it was or will be completed. Scope of the project. Size of the project. The dollar value of the construction contract and whether it was design-bid build or design-build. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm's own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. Email responses or questions to Zack Finn at Zachary.D.Finn@usace.army.mil. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this source sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Transportation Terminals

$100,000,000.00

Public - Federal

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
27
Bidding Soon
695
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

img_map_placeholder

41st Division Dr, Joint Base Lewis McChord, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.