Site work, paving and renovation of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

State Project Number 02P0142 Capitol Complex Ramps Repairs 2024 A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Admin Ramp, 50 Sherburne Avenue: Concrete repair, installation of supplemental steel supports, waterproof deck-coating, traffic arrows. 2. Centennial Office Building Ramp: Concrete repair, traffic arrows. 3. State Office Building Ramp: Sealant and Deck Coating. 4. Judicial Building Garage: Concrete repairs. 5. 14th Street Ramp, 135 E. 14th Street: Joint sealant replacement, Tee flange connector repair, Deck Coating. 6. Retirement Systems Building Ramp: Concrete Repair. 7. Andersen Ramp: Barrier cable repair, Drain repair, new drains and piping, deck coating. Est. Completion Date: Aug. 15, 2024 This Project has a 2% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. All questions should be submitted no later than March 18, 2024. The State is not obligated to answer questions submitted after the question due date and time. SUMMARY OF WORK (SEE SECTION 01 10 00 FOR FULL SCOPE OF WORK) A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Admin Ramp, 50 Sherburne Avenue: Concrete repair, installation of supplemental steel supports, waterproof deck-coating, traffic arrows. 2. Centennial Office Building Ramp: Concrete repair, traffic arrows. 3. State Office Building Ramp: Sealant and Deck Coating 4. Judicial Building Garage: Concrete repairs 5. 14th Street Ramp, 135 E. 14th Street: Joint sealant replacement, Tee flange connector repair, Deck Coating. 6. Retirement Systems Building Ramp: Concrete Repair. 7. Andersen Ramp: Barrier cable repair, Drain repair, new drains and piping, deck coating. This project has a 2% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. Targeted Group, Economically Disadvantaged, and Veteran-Owned small businesses that can be used to meet subcontracting goals MUST be certified by the Department of Administration, Office of State Procurement at the time of the subcontractors work on the construction project. TIME OF COMPLETION A. RSB Ramp: The project shall be finally complete no later than June 30, 2024 All other Ramps: The project shall be substantially complete no later than July 31, 2024 B. Final completion of the work will be on or before August 15, 2024

Award

Roads / Highways

$426,533.00

Public - State/Provincial

Paving, Renovation, Site Work

23

14

7

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
136
Bidding Soon
1,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 29, 2024

Project location map

Multiple Locations, Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.