BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

State Project Number 02P0142 Capitol Complex Ramps Repairs 2024 A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Admin Ramp, 50 Sherburne Avenue: Concrete repair, installation of supplemental steel supports, waterproof deck-coating, traffic arrows. 2. Centennial Office Building Ramp: Concrete repair, traffic arrows. 3. State Office Building Ramp: Sealant and Deck Coating. 4. Judicial Building Garage: Concrete repairs. 5. 14th Street Ramp, 135 E. 14th Street: Joint sealant replacement, Tee flange connector repair, Deck Coating. 6. Retirement Systems Building Ramp: Concrete Repair. 7. Andersen Ramp: Barrier cable repair, Drain repair, new drains and piping, deck coating. Est. Completion Date: Aug. 15, 2024 This Project has a 2% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. All questions should be submitted no later than March 18, 2024. The State is not obligated to answer questions submitted after the question due date and time. SUMMARY OF WORK (SEE SECTION 01 10 00 FOR FULL SCOPE OF WORK) A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Admin Ramp, 50 Sherburne Avenue: Concrete repair, installation of supplemental steel supports, waterproof deck-coating, traffic arrows. 2. Centennial Office Building Ramp: Concrete repair, traffic arrows. 3. State Office Building Ramp: Sealant and Deck Coating 4. Judicial Building Garage: Concrete repairs 5. 14th Street Ramp, 135 E. 14th Street: Joint sealant replacement, Tee flange connector repair, Deck Coating. 6. Retirement Systems Building Ramp: Concrete Repair. 7. Andersen Ramp: Barrier cable repair, Drain repair, new drains and piping, deck coating. This project has a 2% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. Targeted Group, Economically Disadvantaged, and Veteran-Owned small businesses that can be used to meet subcontracting goals MUST be certified by the Department of Administration, Office of State Procurement at the time of the subcontractors work on the construction project. TIME OF COMPLETION A. RSB Ramp: The project shall be finally complete no later than June 30, 2024 All other Ramps: The project shall be substantially complete no later than July 31, 2024 B. Final completion of the work will be on or before August 15, 2024

Award

Roads / Highways

$426,533.00

Public - State/Provincial

Paving, Renovation, Site Work

23

14

7

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
70
Bidding Soon
1,718
All Active Projects
597
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 29, 2024

April 29, 2024

August 15, 2024

img_map_placeholder

Multiple Locations, Saint Paul, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.