Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated September 18, 2025
Site work and paving for a road / highway in Bettendorf, Iowa. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of September 17 2025, Currently, we are in preliminary engineering for Middle Rd Reconstruction. According to the engineering contract, plans should be in place for the North Phase to allow for a spring 2026 letting; plans for the South Phase should allow for a winter 2026 letting The Middle Road Reconstruction Project involves the planned reconstruction and expansion of Middle Road from just south of the Forest Grove Drive intersection to just south of the Crow Creek Road intersection. The project limits encompass approximately 8,000 feet (1.5 miles) of existing two (2) and three (3) lane rural cross section pavement. The pavement section itself is composite with a concrete base and hot mix asphalt overlay. As of April 7, 2025, the project is in design. The construction document completion timeline has not been determined. A tentative bid schedule for contractors has not been scheduled. Further details regarding construction and completion timelines have not been identified.
Design
Roads / Highways
$800,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 29, 2025
Middle Rd, Bettendorf, IA
Related To This Project
Bettendorf, IA
Bid Date: Mar 28 2024
Bettendorf, IA
Bid Date: Mar 26 2024
Bettendorf, IA
Bid Date: Mar 22 2024
Bettendorf, IA
Bid Date: Mar 15 2024
Bettendorf, IA
Bid Date: Mar 22 2024
Bettendorf, IA
Bid Date: Apr 09 2024
Bettendorf, IA
Bid Date: Apr 10 2024
Bettendorf, IA
Bid Date: May 01 2024
Bettendorf, IA
Bid Date: Mar 15 2024
Bettendorf, IA
Bid Date: Mar 26 2024
Bettendorf, IA
Bid Date: Mar 12 2024
Bettendorf, IA
Bid Date: Mar 12 2024
Bettendorf, IA
Bid Date: Mar 12 2024
Bettendorf, IA
Bid Date: Mar 08 2024
Bettendorf, IA
Bid Date: Mar 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
