BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work and paving for a road / highway in Brentwood, Tennessee. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project provides for potential context-sensitive roadway improvements along this historic roadway corridor between Jones Parkway and the Brentwood city limits. A preliminary engineering study was in completed in early 2024. The recommended alternative provides for two phases of improvements. Phase I would be the western half of the corridor and provide for construction of a new two-lane road to the north of the existing road, a roundabout at the intersection with Jones Parkway, and conversion of the existing road into a linear park that would connect new subdivisions and existing homes to Windy Hill Park. Phase II covering the eastern half of the corridor would widen the road generally along the existing alignment. Funding for Phase I final design and environmental work is provided in FY 2025 with ROW acquisition and construction funding based on a $10 million project budget is reflected in FY's 2026 - 2027. Scheduling of Phase II work would be dependent on future capital project prioritization. As of September 29, 2025, this project is included in the City of Brentwood Fiscal Year 2025-2029 CiP and funding is allotted for construction in FY 2027, FY 2028, and FY 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$7,810,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
75
Bidding Soon
1,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.